Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Tapia Baldis, Carla; Mendoza López, Martín; Trombotto Liaudat, Dario; Sileo, Noelia (2023): Daily soil temperature records from site GEC-1902 [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.951444, In: Tapia Baldis, C et al. (2023): Daily soil temperature records (2019-2020) for active layer sites (GEC-1901 and GEC-1902) in the Argentinian Andes at 32°S [dataset bundled publication]. PANGAEA, https://doi.org/10.1594/PANGAEA.952657

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Keyword(s):
active layer temperature and moisture; Andes mountains; Argentina; frozen ground; rock glacier; soil temperature
Funding:
National Scientific and Technical Research Council (CONICET), grant/award no. PICT-2019-2019-03799: PERMAROCK: Monitoreo Térmico de Permafrost en Roca
Coverage:
Latitude: -31.900000 * Longitude: -70.180000
Date/Time Start: 2019-03-27T00:00:00 * Date/Time End: 2020-03-02T00:00:00
Minimum Elevation: 4040.0 m * Maximum Elevation: 4040.0 m
Event(s):
Candidato_rock_glacier_GEC-1902 (GEC-1902) * Latitude: -31.900000 * Longitude: -70.180000 * Elevation: 4040.0 m * Location: Central Andes, Argentina * Method/Device: Sampling/measurements on glacier (GLAC)
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
DATE/TIMEDate/TimeTapia Baldis, CarlaGeocode
LocationLocationTapia Baldis, CarlaSite
Sample IDSample IDTapia Baldis, CarlaSampling name
ELEVATIONElevationm a.s.l.Tapia Baldis, CarlaGeocode
Latitude of eventLatitude
Longitude of eventLongitude
DEPTH, soilDepth soilmTapia Baldis, CarlaGeocode
Temperature, soil, daily meanT soil day m°CTapia Baldis, Carla
Status:
Curation Level: Enhanced curation (CurationLevelC)
Size:
4104 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Date/Time

Location

Sample ID

Elevation [m a.s.l.]

Latitude

Longitude

Depth soil [m]

T soil day m [°C]
2019-03-27Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.49
2019-03-28Candidato rock glacierGEC-19024040-31.9000-70.18000.007.40
2019-03-29Candidato rock glacierGEC-19024040-31.9000-70.18000.008.13
2019-03-30Candidato rock glacierGEC-19024040-31.9000-70.18000.003.70
2019-03-31Candidato rock glacierGEC-19024040-31.9000-70.18000.007.13
2019-04-01Candidato rock glacierGEC-19024040-31.9000-70.18000.006.73
2019-04-02Candidato rock glacierGEC-19024040-31.9000-70.18000.007.60
2019-04-03Candidato rock glacierGEC-19024040-31.9000-70.18000.009.36
2019-04-04Candidato rock glacierGEC-19024040-31.9000-70.18000.005.25
2019-04-05Candidato rock glacierGEC-19024040-31.9000-70.18000.001.89
2019-04-06Candidato rock glacierGEC-19024040-31.9000-70.18000.004.15
2019-04-07Candidato rock glacierGEC-19024040-31.9000-70.18000.006.71
2019-04-08Candidato rock glacierGEC-19024040-31.9000-70.18000.009.55
2019-04-09Candidato rock glacierGEC-19024040-31.9000-70.18000.006.49
2019-04-10Candidato rock glacierGEC-19024040-31.9000-70.18000.004.20
2019-04-11Candidato rock glacierGEC-19024040-31.9000-70.18000.002.36
2019-04-12Candidato rock glacierGEC-19024040-31.9000-70.18000.004.54
2019-04-13Candidato rock glacierGEC-19024040-31.9000-70.18000.000.69
2019-04-14Candidato rock glacierGEC-19024040-31.9000-70.18000.003.88
2019-04-15Candidato rock glacierGEC-19024040-31.9000-70.18000.005.74
2019-04-16Candidato rock glacierGEC-19024040-31.9000-70.18000.007.26
2019-04-17Candidato rock glacierGEC-19024040-31.9000-70.18000.007.32
2019-04-18Candidato rock glacierGEC-19024040-31.9000-70.18000.004.48
2019-04-19Candidato rock glacierGEC-19024040-31.9000-70.18000.003.33
2019-04-20Candidato rock glacierGEC-19024040-31.9000-70.18000.002.97
2019-04-21Candidato rock glacierGEC-19024040-31.9000-70.18000.001.22
2019-04-22Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.41
2019-04-23Candidato rock glacierGEC-19024040-31.9000-70.18000.000.87
2019-04-24Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.38
2019-04-25Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.14
2019-04-26Candidato rock glacierGEC-19024040-31.9000-70.18000.000.29
2019-04-27Candidato rock glacierGEC-19024040-31.9000-70.18000.003.34
2019-04-28Candidato rock glacierGEC-19024040-31.9000-70.18000.005.50
2019-04-29Candidato rock glacierGEC-19024040-31.9000-70.18000.004.07
2019-04-30Candidato rock glacierGEC-19024040-31.9000-70.18000.002.89
2019-05-01Candidato rock glacierGEC-19024040-31.9000-70.18000.003.09
2019-05-02Candidato rock glacierGEC-19024040-31.9000-70.18000.004.65
2019-05-03Candidato rock glacierGEC-19024040-31.9000-70.18000.003.63
2019-05-04Candidato rock glacierGEC-19024040-31.9000-70.18000.003.31
2019-05-05Candidato rock glacierGEC-19024040-31.9000-70.18000.003.32
2019-05-06Candidato rock glacierGEC-19024040-31.9000-70.18000.002.92
2019-05-07Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.22
2019-05-08Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.24
2019-05-09Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.52
2019-05-10Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.90
2019-05-11Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.43
2019-05-12Candidato rock glacierGEC-19024040-31.9000-70.18000.002.97
2019-05-13Candidato rock glacierGEC-19024040-31.9000-70.18000.003.31
2019-05-14Candidato rock glacierGEC-19024040-31.9000-70.18000.004.04
2019-05-15Candidato rock glacierGEC-19024040-31.9000-70.18000.003.72
2019-05-16Candidato rock glacierGEC-19024040-31.9000-70.18000.003.96
2019-05-17Candidato rock glacierGEC-19024040-31.9000-70.18000.000.41
2019-05-18Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.72
2019-05-19Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.65
2019-05-20Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.75
2019-05-21Candidato rock glacierGEC-19024040-31.9000-70.18000.00-11.12
2019-05-22Candidato rock glacierGEC-19024040-31.9000-70.18000.00-12.12
2019-05-23Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.17
2019-05-24Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.16
2019-05-25Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.49
2019-05-26Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.30
2019-05-27Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.00
2019-05-28Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.64
2019-05-29Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.67
2019-05-30Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.82
2019-05-31Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.90
2019-06-01Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.06
2019-06-02Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.32
2019-06-03Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.44
2019-06-04Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.65
2019-06-05Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.45
2019-06-06Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.77
2019-06-07Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.44
2019-06-08Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.91
2019-06-09Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.88
2019-06-10Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.08
2019-06-11Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.62
2019-06-12Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.41
2019-06-13Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.86
2019-06-14Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.23
2019-06-15Candidato rock glacierGEC-19024040-31.9000-70.18000.00-10.94
2019-06-16Candidato rock glacierGEC-19024040-31.9000-70.18000.00-11.03
2019-06-17Candidato rock glacierGEC-19024040-31.9000-70.18000.00-12.74
2019-06-18Candidato rock glacierGEC-19024040-31.9000-70.18000.00-11.88
2019-06-19Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.59
2019-06-20Candidato rock glacierGEC-19024040-31.9000-70.18000.001.16
2019-06-21Candidato rock glacierGEC-19024040-31.9000-70.18000.000.78
2019-06-22Candidato rock glacierGEC-19024040-31.9000-70.18000.001.64
2019-06-23Candidato rock glacierGEC-19024040-31.9000-70.18000.001.25
2019-06-24Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.80
2019-06-25Candidato rock glacierGEC-19024040-31.9000-70.18000.00-11.57
2019-06-26Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.54
2019-06-27Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.84
2019-06-28Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.32
2019-06-29Candidato rock glacierGEC-19024040-31.9000-70.18000.00-10.87
2019-06-30Candidato rock glacierGEC-19024040-31.9000-70.18000.00-10.10
2019-07-01Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.84
2019-07-02Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.03
2019-07-03Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.83
2019-07-04Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.33
2019-07-05Candidato rock glacierGEC-19024040-31.9000-70.18000.000.05
2019-07-06Candidato rock glacierGEC-19024040-31.9000-70.18000.002.94
2019-07-07Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.10
2019-07-08Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.60
2019-07-09Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.59
2019-07-10Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.80
2019-07-11Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.17
2019-07-12Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.76
2019-07-13Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.43
2019-07-14Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.50
2019-07-15Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.72
2019-07-16Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.09
2019-07-17Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.11
2019-07-18Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.77
2019-07-19Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.24
2019-07-20Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.76
2019-07-21Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.43
2019-07-22Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.36
2019-07-23Candidato rock glacierGEC-19024040-31.9000-70.18000.00-10.15
2019-07-24Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.43
2019-07-25Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.80
2019-07-26Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.98
2019-07-27Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.36
2019-07-28Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.72
2019-07-29Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.47
2019-07-30Candidato rock glacierGEC-19024040-31.9000-70.18000.000.29
2019-07-31Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.09
2019-08-01Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.83
2019-08-02Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.28
2019-08-03Candidato rock glacierGEC-19024040-31.9000-70.18000.000.31
2019-08-04Candidato rock glacierGEC-19024040-31.9000-70.18000.002.98
2019-08-05Candidato rock glacierGEC-19024040-31.9000-70.18000.003.13
2019-08-06Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.10
2019-08-07Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.69
2019-08-08Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.98
2019-08-09Candidato rock glacierGEC-19024040-31.9000-70.18000.00-8.59
2019-08-10Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.84
2019-08-11Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.64
2019-08-12Candidato rock glacierGEC-19024040-31.9000-70.18000.00-6.10
2019-08-13Candidato rock glacierGEC-19024040-31.9000-70.18000.001.09
2019-08-14Candidato rock glacierGEC-19024040-31.9000-70.18000.003.77
2019-08-15Candidato rock glacierGEC-19024040-31.9000-70.18000.002.00
2019-08-16Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.81
2019-08-17Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.68
2019-08-18Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.05
2019-08-19Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.07
2019-08-20Candidato rock glacierGEC-19024040-31.9000-70.18000.000.65
2019-08-21Candidato rock glacierGEC-19024040-31.9000-70.18000.000.42
2019-08-22Candidato rock glacierGEC-19024040-31.9000-70.18000.001.64
2019-08-23Candidato rock glacierGEC-19024040-31.9000-70.18000.004.56
2019-08-24Candidato rock glacierGEC-19024040-31.9000-70.18000.001.52
2019-08-25Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.24
2019-08-26Candidato rock glacierGEC-19024040-31.9000-70.18000.001.91
2019-08-27Candidato rock glacierGEC-19024040-31.9000-70.18000.005.33
2019-08-28Candidato rock glacierGEC-19024040-31.9000-70.18000.003.72
2019-08-29Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.07
2019-08-30Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.33
2019-08-31Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.12
2019-09-01Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.83
2019-09-02Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.65
2019-09-03Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.60
2019-09-04Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.12
2019-09-05Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.83
2019-09-06Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.54
2019-09-07Candidato rock glacierGEC-19024040-31.9000-70.18000.00-7.91
2019-09-08Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.75
2019-09-09Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.24
2019-09-10Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.65
2019-09-11Candidato rock glacierGEC-19024040-31.9000-70.18000.00-9.57
2019-09-12Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.20
2019-09-13Candidato rock glacierGEC-19024040-31.9000-70.18000.000.88
2019-09-14Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.85
2019-09-15Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.14
2019-09-16Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.36
2019-09-17Candidato rock glacierGEC-19024040-31.9000-70.18000.001.82
2019-09-18Candidato rock glacierGEC-19024040-31.9000-70.18000.001.82
2019-09-19Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.79
2019-09-20Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.55
2019-09-21Candidato rock glacierGEC-19024040-31.9000-70.18000.000.69
2019-09-22Candidato rock glacierGEC-19024040-31.9000-70.18000.003.47
2019-09-23Candidato rock glacierGEC-19024040-31.9000-70.18000.004.61
2019-09-24Candidato rock glacierGEC-19024040-31.9000-70.18000.001.81
2019-09-25Candidato rock glacierGEC-19024040-31.9000-70.18000.005.32
2019-09-26Candidato rock glacierGEC-19024040-31.9000-70.18000.008.70
2019-09-27Candidato rock glacierGEC-19024040-31.9000-70.18000.006.32
2019-09-28Candidato rock glacierGEC-19024040-31.9000-70.18000.006.13
2019-09-29Candidato rock glacierGEC-19024040-31.9000-70.18000.005.76
2019-09-30Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.34
2019-10-01Candidato rock glacierGEC-19024040-31.9000-70.18000.00-4.48
2019-10-02Candidato rock glacierGEC-19024040-31.9000-70.18000.00-5.35
2019-10-03Candidato rock glacierGEC-19024040-31.9000-70.18000.00-3.70
2019-10-04Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.25
2019-10-05Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.46
2019-10-06Candidato rock glacierGEC-19024040-31.9000-70.18000.001.25
2019-10-07Candidato rock glacierGEC-19024040-31.9000-70.18000.002.64
2019-10-08Candidato rock glacierGEC-19024040-31.9000-70.18000.003.72
2019-10-09Candidato rock glacierGEC-19024040-31.9000-70.18000.005.09
2019-10-10Candidato rock glacierGEC-19024040-31.9000-70.18000.005.06
2019-10-11Candidato rock glacierGEC-19024040-31.9000-70.18000.006.77
2019-10-12Candidato rock glacierGEC-19024040-31.9000-70.18000.002.92
2019-10-13Candidato rock glacierGEC-19024040-31.9000-70.18000.003.87
2019-10-14Candidato rock glacierGEC-19024040-31.9000-70.18000.00-2.09
2019-10-15Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.31
2019-10-16Candidato rock glacierGEC-19024040-31.9000-70.18000.000.11
2019-10-17Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.27
2019-10-18Candidato rock glacierGEC-19024040-31.9000-70.18000.002.59
2019-10-19Candidato rock glacierGEC-19024040-31.9000-70.18000.000.95
2019-10-20Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.03
2019-10-21Candidato rock glacierGEC-19024040-31.9000-70.18000.003.16
2019-10-22Candidato rock glacierGEC-19024040-31.9000-70.18000.002.06
2019-10-23Candidato rock glacierGEC-19024040-31.9000-70.18000.00-1.68
2019-10-24Candidato rock glacierGEC-19024040-31.9000-70.18000.002.88
2019-10-25Candidato rock glacierGEC-19024040-31.9000-70.18000.003.33
2019-10-26Candidato rock glacierGEC-19024040-31.9000-70.18000.003.72
2019-10-27Candidato rock glacierGEC-19024040-31.9000-70.18000.002.83
2019-10-28Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.27
2019-10-29Candidato rock glacierGEC-19024040-31.9000-70.18000.00-0.61
2019-10-30Candidato rock glacierGEC-19024040-31.9000-70.18000.003.33
2019-10-31Candidato rock glacierGEC-19024040-31.9000-70.18000.007.89
2019-11-01Candidato rock glacierGEC-19024040-31.9000-70.18000.006.23
2019-11-02Candidato rock glacierGEC-19024040-31.9000-70.18000.005.31
2019-11-03Candidato rock glacierGEC-19024040-31.9000-70.18000.008.49
2019-11-04Candidato rock glacierGEC-19024040-31.9000-70.18000.001.45
2019-11-05Candidato rock glacierGEC-19024040-31.9000-70.18000.003.66
2019-11-06Candidato rock glacierGEC-19024040-31.9000-70.18000.005.34
2019-11-07Candidato rock glacierGEC-19024040-31.9000-70.18000.008.14
2019-11-08Candidato rock glacierGEC-19024040-31.9000-70.18000.009.07
2019-11-09Candidato rock glacierGEC-19024040-31.9000-70.18000.009.78
2019-11-10Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.19
2019-11-11Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.02
2019-11-12Candidato rock glacierGEC-19024040-31.9000-70.18000.008.32
2019-11-13Candidato rock glacierGEC-19024040-31.9000-70.18000.008.15
2019-11-14Candidato rock glacierGEC-19024040-31.9000-70.18000.009.08
2019-11-15Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.83
2019-11-16Candidato rock glacierGEC-19024040-31.9000-70.18000.009.52
2019-11-17Candidato rock glacierGEC-19024040-31.9000-70.18000.009.47
2019-11-18Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.93
2019-11-19Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.56
2019-11-20Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.11
2019-11-21Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.19
2019-11-22Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.43
2019-11-23Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.31
2019-11-24Candidato rock glacierGEC-19024040-31.9000-70.18000.008.91
2019-11-25Candidato rock glacierGEC-19024040-31.9000-70.18000.002.43
2019-11-26Candidato rock glacierGEC-19024040-31.9000-70.18000.002.06
2019-11-27Candidato rock glacierGEC-19024040-31.9000-70.18000.006.46
2019-11-28Candidato rock glacierGEC-19024040-31.9000-70.18000.008.05
2019-11-29Candidato rock glacierGEC-19024040-31.9000-70.18000.006.68
2019-11-30Candidato rock glacierGEC-19024040-31.9000-70.18000.009.44
2019-12-01Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.39
2019-12-02Candidato rock glacierGEC-19024040-31.9000-70.18000.009.85
2019-12-03Candidato rock glacierGEC-19024040-31.9000-70.18000.007.43
2019-12-04Candidato rock glacierGEC-19024040-31.9000-70.18000.004.38
2019-12-05Candidato rock glacierGEC-19024040-31.9000-70.18000.005.84
2019-12-06Candidato rock glacierGEC-19024040-31.9000-70.18000.008.80
2019-12-07Candidato rock glacierGEC-19024040-31.9000-70.18000.007.59
2019-12-08Candidato rock glacierGEC-19024040-31.9000-70.18000.008.40
2019-12-09Candidato rock glacierGEC-19024040-31.9000-70.18000.008.85
2019-12-10Candidato rock glacierGEC-19024040-31.9000-70.18000.009.50
2019-12-11Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.32
2019-12-12Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.99
2019-12-13Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.69
2019-12-14Candidato rock glacierGEC-19024040-31.9000-70.18000.005.60
2019-12-15Candidato rock glacierGEC-19024040-31.9000-70.18000.005.52
2019-12-16Candidato rock glacierGEC-19024040-31.9000-70.18000.005.44
2019-12-17Candidato rock glacierGEC-19024040-31.9000-70.18000.008.68
2019-12-18Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.92
2019-12-19Candidato rock glacierGEC-19024040-31.9000-70.18000.009.59
2019-12-20Candidato rock glacierGEC-19024040-31.9000-70.18000.007.65
2019-12-21Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.86
2019-12-22Candidato rock glacierGEC-19024040-31.9000-70.18000.009.84
2019-12-23Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.43
2019-12-24Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.67
2019-12-25Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.99
2019-12-26Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.34
2019-12-27Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.91
2019-12-28Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.49
2019-12-29Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.33
2019-12-30Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.46
2019-12-31Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.74
2020-01-01Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.73
2020-01-02Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.52
2020-01-03Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.23
2020-01-04Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.43
2020-01-05Candidato rock glacierGEC-19024040-31.9000-70.18000.008.88
2020-01-06Candidato rock glacierGEC-19024040-31.9000-70.18000.004.47
2020-01-07Candidato rock glacierGEC-19024040-31.9000-70.18000.006.23
2020-01-08Candidato rock glacierGEC-19024040-31.9000-70.18000.003.97
2020-01-09Candidato rock glacierGEC-19024040-31.9000-70.18000.006.70
2020-01-10Candidato rock glacierGEC-19024040-31.9000-70.18000.009.96
2020-01-11Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.19
2020-01-12Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.33
2020-01-13Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.48
2020-01-14Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.31
2020-01-15Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.89
2020-01-16Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.31
2020-01-17Candidato rock glacierGEC-19024040-31.9000-70.18000.0016.13
2020-01-18Candidato rock glacierGEC-19024040-31.9000-70.18000.0016.24
2020-01-19Candidato rock glacierGEC-19024040-31.9000-70.18000.0015.71
2020-01-20Candidato rock glacierGEC-19024040-31.9000-70.18000.0015.65
2020-01-21Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.88
2020-01-22Candidato rock glacierGEC-19024040-31.9000-70.18000.0013.22
2020-01-23Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.86
2020-01-24Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.38
2020-01-25Candidato rock glacierGEC-19024040-31.9000-70.18000.0014.85
2020-01-26Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.31
2020-01-27Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.55
2020-01-28Candidato rock glacierGEC-19024040-31.9000-70.18000.009.28
2020-01-29Candidato rock glacierGEC-19024040-31.9000-70.18000.002.96
2020-01-30Candidato rock glacierGEC-19024040-31.9000-70.18000.005.02
2020-01-31Candidato rock glacierGEC-19024040-31.9000-70.18000.006.94
2020-02-01Candidato rock glacierGEC-19024040-31.9000-70.18000.008.96
2020-02-02Candidato rock glacierGEC-19024040-31.9000-70.18000.009.82
2020-02-03Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.27
2020-02-04Candidato rock glacierGEC-19024040-31.9000-70.18000.009.57
2020-02-05Candidato rock glacierGEC-19024040-31.9000-70.18000.007.41
2020-02-06Candidato rock glacierGEC-19024040-31.9000-70.18000.007.64
2020-02-07Candidato rock glacierGEC-19024040-31.9000-70.18000.009.49
2020-02-08Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.36
2020-02-09Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.03
2020-02-10Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.30
2020-02-11Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.92
2020-02-12Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.65
2020-02-13Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.29
2020-02-14Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.86
2020-02-15Candidato rock glacierGEC-19024040-31.9000-70.18000.0012.42
2020-02-16Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.12
2020-02-17Candidato rock glacierGEC-19024040-31.9000-70.18000.008.72
2020-02-18Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.71
2020-02-19Candidato rock glacierGEC-19024040-31.9000-70.18000.0011.56
2020-02-20Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.80
2020-02-21Candidato rock glacierGEC-19024040-31.9000-70.18000.009.51
2020-02-22Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.90
2020-02-23Candidato rock glacierGEC-19024040-31.9000-70.18000.009.74
2020-02-24Candidato rock glacierGEC-19024040-31.9000-70.18000.007.01
2020-02-25Candidato rock glacierGEC-19024040-31.9000-70.18000.005.79
2020-02-26Candidato rock glacierGEC-19024040-31.9000-70.18000.008.43
2020-02-27Candidato rock glacierGEC-19024040-31.9000-70.18000.009.75
2020-02-28Candidato rock glacierGEC-19024040-31.9000-70.18000.009.39
2020-02-29Candidato rock glacierGEC-19024040-31.9000-70.18000.007.63
2020-03-01Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.04
2020-03-02Candidato rock glacierGEC-19024040-31.9000-70.18000.0010.71
2019-03-27Candidato rock glacierGEC-19024040-31.9000-70.18000.3021.03
2019-03-28Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.46
2019-03-29Candidato rock glacierGEC-19024040-31.9000-70.18000.309.26
2019-03-30Candidato rock glacierGEC-19024040-31.9000-70.18000.307.00
2019-03-31Candidato rock glacierGEC-19024040-31.9000-70.18000.305.61
2019-04-01Candidato rock glacierGEC-19024040-31.9000-70.18000.307.94
2019-04-02Candidato rock glacierGEC-19024040-31.9000-70.18000.309.96
2019-04-03Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.19
2019-04-04Candidato rock glacierGEC-19024040-31.9000-70.18000.307.95
2019-04-05Candidato rock glacierGEC-19024040-31.9000-70.18000.305.85
2019-04-06Candidato rock glacierGEC-19024040-31.9000-70.18000.307.03
2019-04-07Candidato rock glacierGEC-19024040-31.9000-70.18000.308.60
2019-04-08Candidato rock glacierGEC-19024040-31.9000-70.18000.309.17
2019-04-09Candidato rock glacierGEC-19024040-31.9000-70.18000.308.83
2019-04-10Candidato rock glacierGEC-19024040-31.9000-70.18000.305.91
2019-04-11Candidato rock glacierGEC-19024040-31.9000-70.18000.305.92
2019-04-12Candidato rock glacierGEC-19024040-31.9000-70.18000.305.13
2019-04-13Candidato rock glacierGEC-19024040-31.9000-70.18000.304.72
2019-04-14Candidato rock glacierGEC-19024040-31.9000-70.18000.303.42
2019-04-15Candidato rock glacierGEC-19024040-31.9000-70.18000.305.04
2019-04-16Candidato rock glacierGEC-19024040-31.9000-70.18000.306.79
2019-04-17Candidato rock glacierGEC-19024040-31.9000-70.18000.307.10
2019-04-18Candidato rock glacierGEC-19024040-31.9000-70.18000.306.38
2019-04-19Candidato rock glacierGEC-19024040-31.9000-70.18000.305.14
2019-04-20Candidato rock glacierGEC-19024040-31.9000-70.18000.303.91
2019-04-21Candidato rock glacierGEC-19024040-31.9000-70.18000.303.18
2019-04-22Candidato rock glacierGEC-19024040-31.9000-70.18000.301.54
2019-04-23Candidato rock glacierGEC-19024040-31.9000-70.18000.301.77
2019-04-24Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.17
2019-04-25Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.63
2019-04-26Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.39
2019-04-27Candidato rock glacierGEC-19024040-31.9000-70.18000.300.32
2019-04-28Candidato rock glacierGEC-19024040-31.9000-70.18000.301.37
2019-04-29Candidato rock glacierGEC-19024040-31.9000-70.18000.302.27
2019-04-30Candidato rock glacierGEC-19024040-31.9000-70.18000.302.38
2019-05-01Candidato rock glacierGEC-19024040-31.9000-70.18000.301.57
2019-05-02Candidato rock glacierGEC-19024040-31.9000-70.18000.302.86
2019-05-03Candidato rock glacierGEC-19024040-31.9000-70.18000.303.13
2019-05-04Candidato rock glacierGEC-19024040-31.9000-70.18000.302.95
2019-05-05Candidato rock glacierGEC-19024040-31.9000-70.18000.302.93
2019-05-06Candidato rock glacierGEC-19024040-31.9000-70.18000.303.52
2019-05-07Candidato rock glacierGEC-19024040-31.9000-70.18000.301.55
2019-05-08Candidato rock glacierGEC-19024040-31.9000-70.18000.300.69
2019-05-09Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.61
2019-05-10Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.19
2019-05-11Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.93
2019-05-12Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.75
2019-05-13Candidato rock glacierGEC-19024040-31.9000-70.18000.301.02
2019-05-14Candidato rock glacierGEC-19024040-31.9000-70.18000.300.30
2019-05-15Candidato rock glacierGEC-19024040-31.9000-70.18000.301.11
2019-05-16Candidato rock glacierGEC-19024040-31.9000-70.18000.301.48
2019-05-17Candidato rock glacierGEC-19024040-31.9000-70.18000.300.52
2019-05-18Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.69
2019-05-19Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.45
2019-05-20Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.62
2019-05-21Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.19
2019-05-22Candidato rock glacierGEC-19024040-31.9000-70.18000.30-10.19
2019-05-23Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.65
2019-05-24Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.02
2019-05-25Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.37
2019-05-26Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.87
2019-05-27Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.84
2019-05-28Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.99
2019-05-29Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.52
2019-05-30Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.46
2019-05-31Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.35
2019-06-01Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.65
2019-06-02Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.46
2019-06-03Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.07
2019-06-04Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.78
2019-06-05Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.41
2019-06-06Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.07
2019-06-07Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.85
2019-06-08Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.35
2019-06-09Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.79
2019-06-10Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.10
2019-06-11Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.48
2019-06-12Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.46
2019-06-13Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.67
2019-06-14Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.23
2019-06-15Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.38
2019-06-16Candidato rock glacierGEC-19024040-31.9000-70.18000.30-13.45
2019-06-17Candidato rock glacierGEC-19024040-31.9000-70.18000.30-12.51
2019-06-18Candidato rock glacierGEC-19024040-31.9000-70.18000.30-12.24
2019-06-19Candidato rock glacierGEC-19024040-31.9000-70.18000.30-10.05
2019-06-20Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.32
2019-06-21Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.99
2019-06-22Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.16
2019-06-23Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.72
2019-06-24Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.76
2019-06-25Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.20
2019-06-26Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.48
2019-06-27Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.79
2019-06-28Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.59
2019-06-29Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.73
2019-06-30Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.65
2019-07-01Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.80
2019-07-02Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.50
2019-07-03Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.78
2019-07-04Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.75
2019-07-05Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.55
2019-07-06Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.01
2019-07-07Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.53
2019-07-08Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.54
2019-07-09Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.24
2019-07-10Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.52
2019-07-11Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.54
2019-07-12Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.83
2019-07-13Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.75
2019-07-14Candidato rock glacierGEC-19024040-31.9000-70.18000.30-7.55
2019-07-15Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.13
2019-07-16Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.64
2019-07-17Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.07
2019-07-18Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.59
2019-07-19Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.71
2019-07-20Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.55
2019-07-21Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.10
2019-07-22Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.22
2019-07-23Candidato rock glacierGEC-19024040-31.9000-70.18000.30-9.03
2019-07-24Candidato rock glacierGEC-19024040-31.9000-70.18000.30-10.56
2019-07-25Candidato rock glacierGEC-19024040-31.9000-70.18000.30-10.10
2019-07-26Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.00
2019-07-27Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.89
2019-07-28Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.77
2019-07-29Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.20
2019-07-30Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.77
2019-07-31Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.36
2019-08-01Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.87
2019-08-02Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.52
2019-08-03Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.04
2019-08-04Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.51
2019-08-05Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.90
2019-08-06Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.22
2019-08-07Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.54
2019-08-08Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.38
2019-08-09Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.99
2019-08-10Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.85
2019-08-11Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.81
2019-08-12Candidato rock glacierGEC-19024040-31.9000-70.18000.30-8.49
2019-08-13Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.47
2019-08-14Candidato rock glacierGEC-19024040-31.9000-70.18000.300.74
2019-08-15Candidato rock glacierGEC-19024040-31.9000-70.18000.301.11
2019-08-16Candidato rock glacierGEC-19024040-31.9000-70.18000.300.43
2019-08-17Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.68
2019-08-18Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.76
2019-08-19Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.18
2019-08-20Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.66
2019-08-21Candidato rock glacierGEC-19024040-31.9000-70.18000.300.30
2019-08-22Candidato rock glacierGEC-19024040-31.9000-70.18000.301.70
2019-08-23Candidato rock glacierGEC-19024040-31.9000-70.18000.302.97
2019-08-24Candidato rock glacierGEC-19024040-31.9000-70.18000.302.99
2019-08-25Candidato rock glacierGEC-19024040-31.9000-70.18000.300.26
2019-08-26Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.03
2019-08-27Candidato rock glacierGEC-19024040-31.9000-70.18000.303.30
2019-08-28Candidato rock glacierGEC-19024040-31.9000-70.18000.304.29
2019-08-29Candidato rock glacierGEC-19024040-31.9000-70.18000.302.22
2019-08-30Candidato rock glacierGEC-19024040-31.9000-70.18000.300.50
2019-08-31Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.61
2019-09-01Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.26
2019-09-02Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.62
2019-09-03Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.07
2019-09-04Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.13
2019-09-05Candidato rock glacierGEC-19024040-31.9000-70.18000.30-3.08
2019-09-06Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.07
2019-09-07Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.09
2019-09-08Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.70
2019-09-09Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.28
2019-09-10Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.62
2019-09-11Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.55
2019-09-12Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.92
2019-09-13Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.51
2019-09-14Candidato rock glacierGEC-19024040-31.9000-70.18000.30-4.63
2019-09-15Candidato rock glacierGEC-19024040-31.9000-70.18000.30-6.07
2019-09-16Candidato rock glacierGEC-19024040-31.9000-70.18000.30-5.46
2019-09-17Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.00
2019-09-18Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.17
2019-09-19Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.83
2019-09-20Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.97
2019-09-21Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.11
2019-09-22Candidato rock glacierGEC-19024040-31.9000-70.18000.302.09
2019-09-23Candidato rock glacierGEC-19024040-31.9000-70.18000.303.30
2019-09-24Candidato rock glacierGEC-19024040-31.9000-70.18000.303.04
2019-09-25Candidato rock glacierGEC-19024040-31.9000-70.18000.305.17
2019-09-26Candidato rock glacierGEC-19024040-31.9000-70.18000.309.32
2019-09-27Candidato rock glacierGEC-19024040-31.9000-70.18000.308.60
2019-09-28Candidato rock glacierGEC-19024040-31.9000-70.18000.306.22
2019-09-29Candidato rock glacierGEC-19024040-31.9000-70.18000.307.00
2019-09-30Candidato rock glacierGEC-19024040-31.9000-70.18000.303.40
2019-10-01Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.49
2019-10-02Candidato rock glacierGEC-19024040-31.9000-70.18000.30-2.36
2019-10-03Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.27
2019-10-04Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.47
2019-10-05Candidato rock glacierGEC-19024040-31.9000-70.18000.300.17
2019-10-06Candidato rock glacierGEC-19024040-31.9000-70.18000.301.76
2019-10-07Candidato rock glacierGEC-19024040-31.9000-70.18000.303.45
2019-10-08Candidato rock glacierGEC-19024040-31.9000-70.18000.305.06
2019-10-09Candidato rock glacierGEC-19024040-31.9000-70.18000.305.77
2019-10-10Candidato rock glacierGEC-19024040-31.9000-70.18000.306.20
2019-10-11Candidato rock glacierGEC-19024040-31.9000-70.18000.307.12
2019-10-12Candidato rock glacierGEC-19024040-31.9000-70.18000.306.16
2019-10-13Candidato rock glacierGEC-19024040-31.9000-70.18000.304.67
2019-10-14Candidato rock glacierGEC-19024040-31.9000-70.18000.30-0.14
2019-10-15Candidato rock glacierGEC-19024040-31.9000-70.18000.30-1.54
2019-10-16Candidato rock glacierGEC-19024040-31.9000-70.18000.301.26
2019-10-17Candidato rock glacierGEC-19024040-31.9000-70.18000.300.95
2019-10-18Candidato rock glacierGEC-19024040-31.9000-70.18000.302.88
2019-10-19Candidato rock glacierGEC-19024040-31.9000-70.18000.302.49
2019-10-20Candidato rock glacierGEC-19024040-31.9000-70.18000.302.60
2019-10-21Candidato rock glacierGEC-19024040-31.9000-70.18000.303.15
2019-10-22Candidato rock glacierGEC-19024040-31.9000-70.18000.304.53
2019-10-23Candidato rock glacierGEC-19024040-31.9000-70.18000.302.01
2019-10-24Candidato rock glacierGEC-19024040-31.9000-70.18000.303.00
2019-10-25Candidato rock glacierGEC-19024040-31.9000-70.18000.304.21
2019-10-26Candidato rock glacierGEC-19024040-31.9000-70.18000.305.56
2019-10-27Candidato rock glacierGEC-19024040-31.9000-70.18000.305.26
2019-10-28Candidato rock glacierGEC-19024040-31.9000-70.18000.302.55
2019-10-29Candidato rock glacierGEC-19024040-31.9000-70.18000.300.90
2019-10-30Candidato rock glacierGEC-19024040-31.9000-70.18000.303.55
2019-10-31Candidato rock glacierGEC-19024040-31.9000-70.18000.307.25
2019-11-01Candidato rock glacierGEC-19024040-31.9000-70.18000.308.35
2019-11-02Candidato rock glacierGEC-19024040-31.9000-70.18000.307.35
2019-11-03Candidato rock glacierGEC-19024040-31.9000-70.18000.309.05
2019-11-04Candidato rock glacierGEC-19024040-31.9000-70.18000.307.09
2019-11-05Candidato rock glacierGEC-19024040-31.9000-70.18000.305.70
2019-11-06Candidato rock glacierGEC-19024040-31.9000-70.18000.306.75
2019-11-07Candidato rock glacierGEC-19024040-31.9000-70.18000.308.91
2019-11-08Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.49
2019-11-09Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.05
2019-11-10Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.14
2019-11-11Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.38
2019-11-12Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.25
2019-11-13Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.56
2019-11-14Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.15
2019-11-15Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.11
2019-11-16Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.91
2019-11-17Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.10
2019-11-18Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.82
2019-11-19Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.61
2019-11-20Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.59
2019-11-21Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.03
2019-11-22Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.41
2019-11-23Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.66
2019-11-24Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.92
2019-11-25Candidato rock glacierGEC-19024040-31.9000-70.18000.309.78
2019-11-26Candidato rock glacierGEC-19024040-31.9000-70.18000.306.14
2019-11-27Candidato rock glacierGEC-19024040-31.9000-70.18000.307.87
2019-11-28Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.24
2019-11-29Candidato rock glacierGEC-19024040-31.9000-70.18000.309.86
2019-11-30Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.83
2019-12-01Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.82
2019-12-02Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.60
2019-12-03Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.97
2019-12-04Candidato rock glacierGEC-19024040-31.9000-70.18000.309.89
2019-12-05Candidato rock glacierGEC-19024040-31.9000-70.18000.308.77
2019-12-06Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.89
2019-12-07Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.73
2019-12-08Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.61
2019-12-09Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.80
2019-12-10Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.32
2019-12-11Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.68
2019-12-12Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.23
2019-12-13Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.93
2019-12-14Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.54
2019-12-15Candidato rock glacierGEC-19024040-31.9000-70.18000.309.33
2019-12-16Candidato rock glacierGEC-19024040-31.9000-70.18000.308.80
2019-12-17Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.54
2019-12-18Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.41
2019-12-19Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.75
2019-12-20Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.55
2019-12-21Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.35
2019-12-22Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.76
2019-12-23Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.69
2019-12-24Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.53
2019-12-25Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.80
2019-12-26Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.62
2019-12-27Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.74
2019-12-28Candidato rock glacierGEC-19024040-31.9000-70.18000.3017.13
2019-12-29Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.09
2019-12-30Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.83
2019-12-31Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.87
2020-01-01Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.44
2020-01-02Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.72
2020-01-03Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.04
2020-01-04Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.04
2020-01-05Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.99
2020-01-06Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.10
2020-01-07Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.07
2020-01-08Candidato rock glacierGEC-19024040-31.9000-70.18000.309.00
2020-01-09Candidato rock glacierGEC-19024040-31.9000-70.18000.308.00
2020-01-10Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.79
2020-01-11Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.11
2020-01-12Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.76
2020-01-13Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.15
2020-01-14Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.08
2020-01-15Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.38
2020-01-16Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.42
2020-01-17Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.19
2020-01-18Candidato rock glacierGEC-19024040-31.9000-70.18000.3018.07
2020-01-19Candidato rock glacierGEC-19024040-31.9000-70.18000.3017.87
2020-01-20Candidato rock glacierGEC-19024040-31.9000-70.18000.3017.78
2020-01-21Candidato rock glacierGEC-19024040-31.9000-70.18000.3017.22
2020-01-22Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.96
2020-01-23Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.58
2020-01-24Candidato rock glacierGEC-19024040-31.9000-70.18000.3018.28
2020-01-25Candidato rock glacierGEC-19024040-31.9000-70.18000.3017.80
2020-01-26Candidato rock glacierGEC-19024040-31.9000-70.18000.3016.45
2020-01-27Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.23
2020-01-28Candidato rock glacierGEC-19024040-31.9000-70.18000.3015.32
2020-01-29Candidato rock glacierGEC-19024040-31.9000-70.18000.307.62
2020-01-30Candidato rock glacierGEC-19024040-31.9000-70.18000.304.45
2020-01-31Candidato rock glacierGEC-19024040-31.9000-70.18000.305.91
2020-02-01Candidato rock glacierGEC-19024040-31.9000-70.18000.308.10
2020-02-02Candidato rock glacierGEC-19024040-31.9000-70.18000.309.16
2020-02-03Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.85
2020-02-04Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.16
2020-02-05Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.81
2020-02-06Candidato rock glacierGEC-19024040-31.9000-70.18000.309.70
2020-02-07Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.12
2020-02-08Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.83
2020-02-09Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.43
2020-02-10Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.06
2020-02-11Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.96
2020-02-12Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.75
2020-02-13Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.19
2020-02-14Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.41
2020-02-15Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.01
2020-02-16Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.60
2020-02-17Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.72
2020-02-18Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.80
2020-02-19Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.63
2020-02-20Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.73
2020-02-21Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.12
2020-02-22Candidato rock glacierGEC-19024040-31.9000-70.18000.3014.16
2020-02-23Candidato rock glacierGEC-19024040-31.9000-70.18000.3013.34
2020-02-24Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.91
2020-02-25Candidato rock glacierGEC-19024040-31.9000-70.18000.309.88
2020-02-26Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.43
2020-02-27Candidato rock glacierGEC-19024040-31.9000-70.18000.3011.99
2020-02-28Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.32
2020-02-29Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.23
2020-03-01Candidato rock glacierGEC-19024040-31.9000-70.18000.3010.00
2020-03-02Candidato rock glacierGEC-19024040-31.9000-70.18000.3012.22
2019-03-27Candidato rock glacierGEC-19024040-31.9000-70.18000.6017.06
2019-03-28Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.92
2019-03-29Candidato rock glacierGEC-19024040-31.9000-70.18000.607.51
2019-03-30Candidato rock glacierGEC-19024040-31.9000-70.18000.607.08
2019-03-31Candidato rock glacierGEC-19024040-31.9000-70.18000.605.70
2019-04-01Candidato rock glacierGEC-19024040-31.9000-70.18000.605.77
2019-04-02Candidato rock glacierGEC-19024040-31.9000-70.18000.607.34
2019-04-03Candidato rock glacierGEC-19024040-31.9000-70.18000.608.31
2019-04-04Candidato rock glacierGEC-19024040-31.9000-70.18000.606.89
2019-04-05Candidato rock glacierGEC-19024040-31.9000-70.18000.606.02
2019-04-06Candidato rock glacierGEC-19024040-31.9000-70.18000.606.46
2019-04-07Candidato rock glacierGEC-19024040-31.9000-70.18000.607.48
2019-04-08Candidato rock glacierGEC-19024040-31.9000-70.18000.607.44
2019-04-09Candidato rock glacierGEC-19024040-31.9000-70.18000.606.89
2019-04-10Candidato rock glacierGEC-19024040-31.9000-70.18000.606.02
2019-04-11Candidato rock glacierGEC-19024040-31.9000-70.18000.605.92
2019-04-12Candidato rock glacierGEC-19024040-31.9000-70.18000.605.76
2019-04-13Candidato rock glacierGEC-19024040-31.9000-70.18000.604.85
2019-04-14Candidato rock glacierGEC-19024040-31.9000-70.18000.603.58
2019-04-15Candidato rock glacierGEC-19024040-31.9000-70.18000.603.86
2019-04-16Candidato rock glacierGEC-19024040-31.9000-70.18000.604.39
2019-04-17Candidato rock glacierGEC-19024040-31.9000-70.18000.604.85
2019-04-18Candidato rock glacierGEC-19024040-31.9000-70.18000.605.02
2019-04-19Candidato rock glacierGEC-19024040-31.9000-70.18000.604.76
2019-04-20Candidato rock glacierGEC-19024040-31.9000-70.18000.603.98
2019-04-21Candidato rock glacierGEC-19024040-31.9000-70.18000.603.65
2019-04-22Candidato rock glacierGEC-19024040-31.9000-70.18000.602.76
2019-04-23Candidato rock glacierGEC-19024040-31.9000-70.18000.602.26
2019-04-24Candidato rock glacierGEC-19024040-31.9000-70.18000.602.25
2019-04-25Candidato rock glacierGEC-19024040-31.9000-70.18000.601.25
2019-04-26Candidato rock glacierGEC-19024040-31.9000-70.18000.601.03
2019-04-27Candidato rock glacierGEC-19024040-31.9000-70.18000.600.76
2019-04-28Candidato rock glacierGEC-19024040-31.9000-70.18000.600.61
2019-04-29Candidato rock glacierGEC-19024040-31.9000-70.18000.600.99
2019-04-30Candidato rock glacierGEC-19024040-31.9000-70.18000.601.23
2019-05-01Candidato rock glacierGEC-19024040-31.9000-70.18000.600.80
2019-05-02Candidato rock glacierGEC-19024040-31.9000-70.18000.600.86
2019-05-03Candidato rock glacierGEC-19024040-31.9000-70.18000.601.36
2019-05-04Candidato rock glacierGEC-19024040-31.9000-70.18000.601.49
2019-05-05Candidato rock glacierGEC-19024040-31.9000-70.18000.601.68
2019-05-06Candidato rock glacierGEC-19024040-31.9000-70.18000.602.00
2019-05-07Candidato rock glacierGEC-19024040-31.9000-70.18000.602.11
2019-05-08Candidato rock glacierGEC-19024040-31.9000-70.18000.601.61
2019-05-09Candidato rock glacierGEC-19024040-31.9000-70.18000.601.18
2019-05-10Candidato rock glacierGEC-19024040-31.9000-70.18000.600.19
2019-05-11Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.72
2019-05-12Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.26
2019-05-13Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.99
2019-05-14Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.61
2019-05-15Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.95
2019-05-16Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.49
2019-05-17Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.28
2019-05-18Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.29
2019-05-19Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.69
2019-05-20Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.42
2019-05-21Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.25
2019-05-22Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.56
2019-05-23Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.36
2019-05-24Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.97
2019-05-25Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.26
2019-05-26Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.77
2019-05-27Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.33
2019-05-28Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.06
2019-05-29Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.69
2019-05-30Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.39
2019-05-31Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.23
2019-06-01Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.23
2019-06-02Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.16
2019-06-03Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.97
2019-06-04Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.90
2019-06-05Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.68
2019-06-06Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.74
2019-06-07Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.00
2019-06-08Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.17
2019-06-09Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.20
2019-06-10Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.29
2019-06-11Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.48
2019-06-12Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.30
2019-06-13Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.12
2019-06-14Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.93
2019-06-15Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.42
2019-06-16Candidato rock glacierGEC-19024040-31.9000-70.18000.60-9.33
2019-06-17Candidato rock glacierGEC-19024040-31.9000-70.18000.60-9.82
2019-06-18Candidato rock glacierGEC-19024040-31.9000-70.18000.60-9.65
2019-06-19Candidato rock glacierGEC-19024040-31.9000-70.18000.60-9.40
2019-06-20Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.15
2019-06-21Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.97
2019-06-22Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.10
2019-06-23Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.19
2019-06-24Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.29
2019-06-25Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.40
2019-06-26Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.36
2019-06-27Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.90
2019-06-28Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.73
2019-06-29Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.17
2019-06-30Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.68
2019-07-01Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.15
2019-07-02Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.43
2019-07-03Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.52
2019-07-04Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.07
2019-07-05Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.59
2019-07-06Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.52
2019-07-07Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.47
2019-07-08Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.15
2019-07-09Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.44
2019-07-10Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.98
2019-07-11Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.48
2019-07-12Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.00
2019-07-13Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.33
2019-07-14Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.57
2019-07-15Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.85
2019-07-16Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.60
2019-07-17Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.91
2019-07-18Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.18
2019-07-19Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.04
2019-07-20Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.18
2019-07-21Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.95
2019-07-22Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.77
2019-07-23Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.80
2019-07-24Candidato rock glacierGEC-19024040-31.9000-70.18000.60-9.05
2019-07-25Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.84
2019-07-26Candidato rock glacierGEC-19024040-31.9000-70.18000.60-8.07
2019-07-27Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.08
2019-07-28Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.88
2019-07-29Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.16
2019-07-30Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.35
2019-07-31Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.90
2019-08-01Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.76
2019-08-02Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.49
2019-08-03Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.92
2019-08-04Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.57
2019-08-05Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.25
2019-08-06Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.59
2019-08-07Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.73
2019-08-08Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.10
2019-08-09Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.93
2019-08-10Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.56
2019-08-11Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.21
2019-08-12Candidato rock glacierGEC-19024040-31.9000-70.18000.60-7.39
2019-08-13Candidato rock glacierGEC-19024040-31.9000-70.18000.60-6.44
2019-08-14Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.99
2019-08-15Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.27
2019-08-16Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.25
2019-08-17Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.90
2019-08-18Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.57
2019-08-19Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.47
2019-08-20Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.38
2019-08-21Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.96
2019-08-22Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.02
2019-08-23Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.41
2019-08-24Candidato rock glacierGEC-19024040-31.9000-70.18000.600.28
2019-08-25Candidato rock glacierGEC-19024040-31.9000-70.18000.600.26
2019-08-26Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.09
2019-08-27Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.22
2019-08-28Candidato rock glacierGEC-19024040-31.9000-70.18000.601.14
2019-08-29Candidato rock glacierGEC-19024040-31.9000-70.18000.601.39
2019-08-30Candidato rock glacierGEC-19024040-31.9000-70.18000.600.46
2019-08-31Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.37
2019-09-01Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.71
2019-09-02Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.77
2019-09-03Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.13
2019-09-04Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.97
2019-09-05Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.32
2019-09-06Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.71
2019-09-07Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.99
2019-09-08Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.26
2019-09-09Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.44
2019-09-10Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.84
2019-09-11Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.13
2019-09-12Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.53
2019-09-13Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.55
2019-09-14Candidato rock glacierGEC-19024040-31.9000-70.18000.60-4.25
2019-09-15Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.13
2019-09-16Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.36
2019-09-17Candidato rock glacierGEC-19024040-31.9000-70.18000.60-5.42
2019-09-18Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.56
2019-09-19Candidato rock glacierGEC-19024040-31.9000-70.18000.60-2.23
2019-09-20Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.21
2019-09-21Candidato rock glacierGEC-19024040-31.9000-70.18000.60-3.02
2019-09-22Candidato rock glacierGEC-19024040-31.9000-70.18000.60-1.37
2019-09-23Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.23
2019-09-24Candidato rock glacierGEC-19024040-31.9000-70.18000.601.11
2019-09-25Candidato rock glacierGEC-19024040-31.9000-70.18000.603.34
2019-09-26Candidato rock glacierGEC-19024040-31.9000-70.18000.605.73
2019-09-27Candidato rock glacierGEC-19024040-31.9000-70.18000.605.98
2019-09-28Candidato rock glacierGEC-19024040-31.9000-70.18000.604.05
2019-09-29Candidato rock glacierGEC-19024040-31.9000-70.18000.604.04
2019-09-30Candidato rock glacierGEC-19024040-31.9000-70.18000.603.39
2019-10-01Candidato rock glacierGEC-19024040-31.9000-70.18000.600.88
2019-10-02Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.85
2019-10-03Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.99
2019-10-04Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.84
2019-10-05Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.63
2019-10-06Candidato rock glacierGEC-19024040-31.9000-70.18000.60-0.30
2019-10-07Candidato rock glacierGEC-19024040-31.9000-70.18000.600.88
2019-10-08Candidato rock glacierGEC-19024040-31.9000-70.18000.602.09
2019-10-09Candidato rock glacierGEC-19024040-31.9000-70.18000.602.82
2019-10-10Candidato rock glacierGEC-19024040-31.9000-70.18000.603.32
2019-10-11Candidato rock glacierGEC-19024040-31.9000-70.18000.604.15
2019-10-12Candidato rock glacierGEC-19024040-31.9000-70.18000.604.66
2019-10-13Candidato rock glacierGEC-19024040-31.9000-70.18000.604.03
2019-10-14Candidato rock glacierGEC-19024040-31.9000-70.18000.602.88
2019-10-15Candidato rock glacierGEC-19024040-31.9000-70.18000.600.32
2019-10-16Candidato rock glacierGEC-19024040-31.9000-70.18000.600.76
2019-10-17Candidato rock glacierGEC-19024040-31.9000-70.18000.600.81
2019-10-18Candidato rock glacierGEC-19024040-31.9000-70.18000.601.24
2019-10-19Candidato rock glacierGEC-19024040-31.9000-70.18000.602.38
2019-10-20Candidato rock glacierGEC-19024040-31.9000-70.18000.602.06
2019-10-21Candidato rock glacierGEC-19024040-31.9000-70.18000.601.89
2019-10-22Candidato rock glacierGEC-19024040-31.9000-70.18000.602.92
2019-10-23Candidato rock glacierGEC-19024040-31.9000-70.18000.602.59
2019-10-24Candidato rock glacierGEC-19024040-31.9000-70.18000.601.77
2019-10-25Candidato rock glacierGEC-19024040-31.9000-70.18000.602.65
2019-10-26Candidato rock glacierGEC-19024040-31.9000-70.18000.603.30
2019-10-27Candidato rock glacierGEC-19024040-31.9000-70.18000.604.15
2019-10-28Candidato rock glacierGEC-19024040-31.9000-70.18000.603.44
2019-10-29Candidato rock glacierGEC-19024040-31.9000-70.18000.601.27
2019-10-30Candidato rock glacierGEC-19024040-31.9000-70.18000.601.99
2019-10-31Candidato rock glacierGEC-19024040-31.9000-70.18000.603.46
2019-11-01Candidato rock glacierGEC-19024040-31.9000-70.18000.605.15
2019-11-02Candidato rock glacierGEC-19024040-31.9000-70.18000.605.54
2019-11-03Candidato rock glacierGEC-19024040-31.9000-70.18000.605.67
2019-11-04Candidato rock glacierGEC-19024040-31.9000-70.18000.606.18
2019-11-05Candidato rock glacierGEC-19024040-31.9000-70.18000.604.95
2019-11-06Candidato rock glacierGEC-19024040-31.9000-70.18000.605.21
2019-11-07Candidato rock glacierGEC-19024040-31.9000-70.18000.605.60
2019-11-08Candidato rock glacierGEC-19024040-31.9000-70.18000.606.73
2019-11-09Candidato rock glacierGEC-19024040-31.9000-70.18000.607.27
2019-11-10Candidato rock glacierGEC-19024040-31.9000-70.18000.608.03
2019-11-11Candidato rock glacierGEC-19024040-31.9000-70.18000.608.67
2019-11-12Candidato rock glacierGEC-19024040-31.9000-70.18000.609.10
2019-11-13Candidato rock glacierGEC-19024040-31.9000-70.18000.608.90
2019-11-14Candidato rock glacierGEC-19024040-31.9000-70.18000.608.66
2019-11-15Candidato rock glacierGEC-19024040-31.9000-70.18000.609.34
2019-11-16Candidato rock glacierGEC-19024040-31.9000-70.18000.609.67
2019-11-17Candidato rock glacierGEC-19024040-31.9000-70.18000.609.55
2019-11-18Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.01
2019-11-19Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.42
2019-11-20Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.86
2019-11-21Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.32
2019-11-22Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.13
2019-11-23Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.03
2019-11-24Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.10
2019-11-25Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.22
2019-11-26Candidato rock glacierGEC-19024040-31.9000-70.18000.607.68
2019-11-27Candidato rock glacierGEC-19024040-31.9000-70.18000.606.85
2019-11-28Candidato rock glacierGEC-19024040-31.9000-70.18000.607.95
2019-11-29Candidato rock glacierGEC-19024040-31.9000-70.18000.608.64
2019-11-30Candidato rock glacierGEC-19024040-31.9000-70.18000.608.42
2019-12-01Candidato rock glacierGEC-19024040-31.9000-70.18000.609.31
2019-12-02Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.18
2019-12-03Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.27
2019-12-04Candidato rock glacierGEC-19024040-31.9000-70.18000.609.51
2019-12-05Candidato rock glacierGEC-19024040-31.9000-70.18000.608.42
2019-12-06Candidato rock glacierGEC-19024040-31.9000-70.18000.608.87
2019-12-07Candidato rock glacierGEC-19024040-31.9000-70.18000.609.21
2019-12-08Candidato rock glacierGEC-19024040-31.9000-70.18000.609.05
2019-12-09Candidato rock glacierGEC-19024040-31.9000-70.18000.609.44
2019-12-10Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.32
2019-12-11Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.76
2019-12-12Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.83
2019-12-13Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.66
2019-12-14Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.42
2019-12-15Candidato rock glacierGEC-19024040-31.9000-70.18000.609.67
2019-12-16Candidato rock glacierGEC-19024040-31.9000-70.18000.608.94
2019-12-17Candidato rock glacierGEC-19024040-31.9000-70.18000.608.77
2019-12-18Candidato rock glacierGEC-19024040-31.9000-70.18000.609.82
2019-12-19Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.39
2019-12-20Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.37
2019-12-21Candidato rock glacierGEC-19024040-31.9000-70.18000.609.93
2019-12-22Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.56
2019-12-23Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.43
2019-12-24Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.54
2019-12-25Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.28
2019-12-26Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.73
2019-12-27Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.05
2019-12-28Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.64
2019-12-29Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.63
2019-12-30Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.74
2019-12-31Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.81
2020-01-01Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.42
2020-01-02Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.74
2020-01-03Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.58
2020-01-04Candidato rock glacierGEC-19024040-31.9000-70.18000.6015.41
2020-01-05Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.54
2020-01-06Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.90
2020-01-07Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.46
2020-01-08Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.32
2020-01-09Candidato rock glacierGEC-19024040-31.9000-70.18000.608.70
2020-01-10Candidato rock glacierGEC-19024040-31.9000-70.18000.609.12
2020-01-11Candidato rock glacierGEC-19024040-31.9000-70.18000.609.99
2020-01-12Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.74
2020-01-13Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.12
2020-01-14Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.94
2020-01-15Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.63
2020-01-16Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.94
2020-01-17Candidato rock glacierGEC-19024040-31.9000-70.18000.6015.69
2020-01-18Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.97
2020-01-19Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.95
2020-01-20Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.91
2020-01-21Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.74
2020-01-22Candidato rock glacierGEC-19024040-31.9000-70.18000.6016.51
2020-01-23Candidato rock glacierGEC-19024040-31.9000-70.18000.6015.94
2020-01-24Candidato rock glacierGEC-19024040-31.9000-70.18000.6016.86
2020-01-25Candidato rock glacierGEC-19024040-31.9000-70.18000.6015.90
2020-01-26Candidato rock glacierGEC-19024040-31.9000-70.18000.6015.18
2020-01-27Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.60
2020-01-28Candidato rock glacierGEC-19024040-31.9000-70.18000.6014.65
2020-01-29Candidato rock glacierGEC-19024040-31.9000-70.18000.6013.07
2020-01-30Candidato rock glacierGEC-19024040-31.9000-70.18000.609.50
2020-01-31Candidato rock glacierGEC-19024040-31.9000-70.18000.608.25
2020-02-01Candidato rock glacierGEC-19024040-31.9000-70.18000.608.39
2020-02-02Candidato rock glacierGEC-19024040-31.9000-70.18000.608.34
2020-02-03Candidato rock glacierGEC-19024040-31.9000-70.18000.608.97
2020-02-04Candidato rock glacierGEC-19024040-31.9000-70.18000.609.66
2020-02-05Candidato rock glacierGEC-19024040-31.9000-70.18000.609.66
2020-02-06Candidato rock glacierGEC-19024040-31.9000-70.18000.609.15
2020-02-07Candidato rock glacierGEC-19024040-31.9000-70.18000.609.04
2020-02-08Candidato rock glacierGEC-19024040-31.9000-70.18000.609.34
2020-02-09Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.15
2020-02-10Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.95
2020-02-11Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.04
2020-02-12Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.38
2020-02-13Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.56
2020-02-14Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.44
2020-02-15Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.23
2020-02-16Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.73
2020-02-17Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.26
2020-02-18Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.86
2020-02-19Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.97
2020-02-20Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.33
2020-02-21Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.58
2020-02-22Candidato rock glacierGEC-19024040-31.9000-70.18000.6012.42
2020-02-23Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.69
2020-02-24Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.10
2020-02-25Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.15
2020-02-26Candidato rock glacierGEC-19024040-31.9000-70.18000.609.71
2020-02-27Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.16
2020-02-28Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.42
2020-02-29Candidato rock glacierGEC-19024040-31.9000-70.18000.6011.08
2020-03-01Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.61
2020-03-02Candidato rock glacierGEC-19024040-31.9000-70.18000.6010.33
2019-03-27Candidato rock glacierGEC-19024040-31.9000-70.18000.956.77
2019-03-28Candidato rock glacierGEC-19024040-31.9000-70.18000.956.13
2019-03-29Candidato rock glacierGEC-19024040-31.9000-70.18000.955.26
2019-03-30Candidato rock glacierGEC-19024040-31.9000-70.18000.954.77
2019-03-31Candidato rock glacierGEC-19024040-31.9000-70.18000.954.67
2019-04-01Candidato rock glacierGEC-19024040-31.9000-70.18000.954.35
2019-04-02Candidato rock glacierGEC-19024040-31.9000-70.18000.954.21
2019-04-03Candidato rock glacierGEC-19024040-31.9000-70.18000.954.85
2019-04-04Candidato rock glacierGEC-19024040-31.9000-70.18000.954.36
2019-04-05Candidato rock glacierGEC-19024040-31.9000-70.18000.954.21
2019-04-06Candidato rock glacierGEC-19024040-31.9000-70.18000.954.12
2019-04-07Candidato rock glacierGEC-19024040-31.9000-70.18000.954.19
2019-04-08Candidato rock glacierGEC-19024040-31.9000-70.18000.954.32
2019-04-09Candidato rock glacierGEC-19024040-31.9000-70.18000.954.35
2019-04-10Candidato rock glacierGEC-19024040-31.9000-70.18000.954.57
2019-04-11Candidato rock glacierGEC-19024040-31.9000-70.18000.954.10
2019-04-12Candidato rock glacierGEC-19024040-31.9000-70.18000.954.12
2019-04-13Candidato rock glacierGEC-19024040-31.9000-70.18000.953.82
2019-04-14Candidato rock glacierGEC-19024040-31.9000-70.18000.953.67
2019-04-15Candidato rock glacierGEC-19024040-31.9000-70.18000.953.11
2019-04-16Candidato rock glacierGEC-19024040-31.9000-70.18000.952.85
2019-04-17Candidato rock glacierGEC-19024040-31.9000-70.18000.953.00
2019-04-18Candidato rock glacierGEC-19024040-31.9000-70.18000.953.06
2019-04-19Candidato rock glacierGEC-19024040-31.9000-70.18000.953.42
2019-04-20Candidato rock glacierGEC-19024040-31.9000-70.18000.953.45
2019-04-21Candidato rock glacierGEC-19024040-31.9000-70.18000.953.09
2019-04-22Candidato rock glacierGEC-19024040-31.9000-70.18000.952.71
2019-04-23Candidato rock glacierGEC-19024040-31.9000-70.18000.952.32
2019-04-24Candidato rock glacierGEC-19024040-31.9000-70.18000.951.69
2019-04-25Candidato rock glacierGEC-19024040-31.9000-70.18000.951.87
2019-04-26Candidato rock glacierGEC-19024040-31.9000-70.18000.951.62
2019-04-27Candidato rock glacierGEC-19024040-31.9000-70.18000.951.19
2019-04-28Candidato rock glacierGEC-19024040-31.9000-70.18000.950.89
2019-04-29Candidato rock glacierGEC-19024040-31.9000-70.18000.950.67
2019-04-30Candidato rock glacierGEC-19024040-31.9000-70.18000.950.66
2019-05-01Candidato rock glacierGEC-19024040-31.9000-70.18000.950.72
2019-05-02Candidato rock glacierGEC-19024040-31.9000-70.18000.950.24
2019-05-03Candidato rock glacierGEC-19024040-31.9000-70.18000.950.29
2019-05-04Candidato rock glacierGEC-19024040-31.9000-70.18000.950.54
2019-05-05Candidato rock glacierGEC-19024040-31.9000-70.18000.950.65
2019-05-06Candidato rock glacierGEC-19024040-31.9000-70.18000.950.70
2019-05-07Candidato rock glacierGEC-19024040-31.9000-70.18000.951.04
2019-05-08Candidato rock glacierGEC-19024040-31.9000-70.18000.951.36
2019-05-09Candidato rock glacierGEC-19024040-31.9000-70.18000.951.26
2019-05-10Candidato rock glacierGEC-19024040-31.9000-70.18000.950.85
2019-05-11Candidato rock glacierGEC-19024040-31.9000-70.18000.950.49
2019-05-12Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.16
2019-05-13Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.80
2019-05-14Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.88
2019-05-15Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.03
2019-05-16Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.86
2019-05-17Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.60
2019-05-18Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.57
2019-05-19Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.87
2019-05-20Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.19
2019-05-21Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.02
2019-05-22Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.36
2019-05-23Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.70
2019-05-24Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.61
2019-05-25Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.25
2019-05-26Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.89
2019-05-27Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.99
2019-05-28Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.18
2019-05-29Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.34
2019-05-30Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.18
2019-05-31Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.13
2019-06-01Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.12
2019-06-02Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.04
2019-06-03Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.91
2019-06-04Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.89
2019-06-05Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.76
2019-06-06Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.72
2019-06-07Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.70
2019-06-08Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.79
2019-06-09Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.92
2019-06-10Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.03
2019-06-11Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.12
2019-06-12Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.40
2019-06-13Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.77
2019-06-14Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.25
2019-06-15Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.86
2019-06-16Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.71
2019-06-17Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.55
2019-06-18Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.57
2019-06-19Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.51
2019-06-20Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.45
2019-06-21Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.27
2019-06-22Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.90
2019-06-23Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.53
2019-06-24Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.95
2019-06-25Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.52
2019-06-26Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.66
2019-06-27Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.16
2019-06-28Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.49
2019-06-29Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.61
2019-06-30Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.77
2019-07-01Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.03
2019-07-02Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.32
2019-07-03Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.73
2019-07-04Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.93
2019-07-05Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.88
2019-07-06Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.62
2019-07-07Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.12
2019-07-08Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.58
2019-07-09Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.20
2019-07-10Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.09
2019-07-11Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.21
2019-07-12Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.45
2019-07-13Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.75
2019-07-14Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.14
2019-07-15Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.29
2019-07-16Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.99
2019-07-17Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.55
2019-07-18Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.08
2019-07-19Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.74
2019-07-20Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.46
2019-07-21Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.13
2019-07-22Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.31
2019-07-23Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.78
2019-07-24Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.78
2019-07-25Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.43
2019-07-26Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.55
2019-07-27Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.40
2019-07-28Candidato rock glacierGEC-19024040-31.9000-70.18000.95-6.04
2019-07-29Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.70
2019-07-30Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.32
2019-07-31Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.17
2019-08-01Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.06
2019-08-02Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.55
2019-08-03Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.92
2019-08-04Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.87
2019-08-05Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.46
2019-08-06Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.85
2019-08-07Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.44
2019-08-08Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.30
2019-08-09Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.52
2019-08-10Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.16
2019-08-11Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.91
2019-08-12Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.18
2019-08-13Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.78
2019-08-14Candidato rock glacierGEC-19024040-31.9000-70.18000.95-5.48
2019-08-15Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.66
2019-08-16Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.77
2019-08-17Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.42
2019-08-18Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.67
2019-08-19Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.77
2019-08-20Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.79
2019-08-21Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.57
2019-08-22Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.11
2019-08-23Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.73
2019-08-24Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.34
2019-08-25Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.90
2019-08-26Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.72
2019-08-27Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.83
2019-08-28Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.58
2019-08-29Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.98
2019-08-30Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.73
2019-08-31Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.86
2019-09-01Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.12
2019-09-02Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.34
2019-09-03Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.53
2019-09-04Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.68
2019-09-05Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.64
2019-09-06Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.77
2019-09-07Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.05
2019-09-08Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.30
2019-09-09Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.56
2019-09-10Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.73
2019-09-11Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.95
2019-09-12Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.25
2019-09-13Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.52
2019-09-14Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.67
2019-09-15Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.98
2019-09-16Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.47
2019-09-17Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.77
2019-09-18Candidato rock glacierGEC-19024040-31.9000-70.18000.95-4.58
2019-09-19Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.79
2019-09-20Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.22
2019-09-21Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.45
2019-09-22Candidato rock glacierGEC-19024040-31.9000-70.18000.95-3.20
2019-09-23Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.44
2019-09-24Candidato rock glacierGEC-19024040-31.9000-70.18000.95-2.06
2019-09-25Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.15
2019-09-26Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.29
2019-09-27Candidato rock glacierGEC-19024040-31.9000-70.18000.950.62
2019-09-28Candidato rock glacierGEC-19024040-31.9000-70.18000.950.93
2019-09-29Candidato rock glacierGEC-19024040-31.9000-70.18000.950.94
2019-09-30Candidato rock glacierGEC-19024040-31.9000-70.18000.951.27
2019-10-01Candidato rock glacierGEC-19024040-31.9000-70.18000.951.03
2019-10-02Candidato rock glacierGEC-19024040-31.9000-70.18000.950.25
2019-10-03Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.48
2019-10-04Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.98
2019-10-05Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.23
2019-10-06Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.28
2019-10-07Candidato rock glacierGEC-19024040-31.9000-70.18000.95-1.22
2019-10-08Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.77
2019-10-09Candidato rock glacierGEC-19024040-31.9000-70.18000.95-0.16
2019-10-10Candidato rock glacierGEC-19024040-31.9000-70.18000.950.38
2019-10-11Candidato rock glacierGEC-19024040-31.9000-70.18000.951.01
2019-10-12Candidato rock glacierGEC-19024040-31.9000-70.18000.951.60
2019-10-13Candidato rock glacierGEC-19024040-31.9000-70.18000.951.92
2019-10-14Candidato rock glacierGEC-19024040-31.9000-70.18000.951.95
2019-10-15Candidato rock glacierGEC-19024040-31.9000-70.18000.951.58
2019-10-16Candidato rock glacierGEC-19024040-31.9000-70.18000.950.95
2019-10-17Candidato rock glacierGEC-19024040-31.9000-70.18000.950.72
2019-10-18Candidato rock glacierGEC-19024040-31.9000-70.18000.950.48
2019-10-19Candidato rock glacierGEC-19024040-31.9000-70.18000.950.62
2019-10-20Candidato rock glacierGEC-19024040-31.9000-70.18000.950.94
2019-10-21Candidato rock glacierGEC-19024040-31.9000-70.18000.950.92
2019-10-22Candidato rock glacierGEC-19024040-31.9000-70.18000.950.94
2019-10-23Candidato rock glacierGEC-19024040-31.9000-70.18000.951.21
2019-10-24Candidato rock glacierGEC-19024040-31.9000-70.18000.951.12
2019-10-25Candidato rock glacierGEC-19024040-31.9000-70.18000.951.04
2019-10-26Candidato rock glacierGEC-19024040-31.9000-70.18000.951.30
2019-10-27Candidato rock glacierGEC-19024040-31.9000-70.18000.951.73
2019-10-28Candidato rock glacierGEC-19024040-31.9000-70.18000.951.97
2019-10-29Candidato rock glacierGEC-19024040-31.9000-70.18000.951.52
2019-10-30Candidato rock glacierGEC-19024040-31.9000-70.18000.950.97
2019-10-31Candidato rock glacierGEC-19024040-31.9000-70.18000.950.97
2019-11-01Candidato rock glacierGEC-19024040-31.9000-70.18000.951.55
2019-11-02Candidato rock glacierGEC-19024040-31.9000-70.18000.952.26
2019-11-03Candidato rock glacierGEC-19024040-31.9000-70.18000.952.62
2019-11-04Candidato rock glacierGEC-19024040-31.9000-70.18000.953.04
2019-11-05Candidato rock glacierGEC-19024040-31.9000-70.18000.953.25
2019-11-06Candidato rock glacierGEC-19024040-31.9000-70.18000.953.14
2019-11-07Candidato rock glacierGEC-19024040-31.9000-70.18000.953.05
2019-11-08Candidato rock glacierGEC-19024040-31.9000-70.18000.953.30
2019-11-09Candidato rock glacierGEC-19024040-31.9000-70.18000.953.78
2019-11-10Candidato rock glacierGEC-19024040-31.9000-70.18000.954.17
2019-11-11Candidato rock glacierGEC-19024040-31.9000-70.18000.954.53
2019-11-12Candidato rock glacierGEC-19024040-31.9000-70.18000.955.01
2019-11-13Candidato rock glacierGEC-19024040-31.9000-70.18000.955.52
2019-11-14Candidato rock glacierGEC-19024040-31.9000-70.18000.955.61
2019-11-15Candidato rock glacierGEC-19024040-31.9000-70.18000.955.86
2019-11-16Candidato rock glacierGEC-19024040-31.9000-70.18000.956.26
2019-11-17Candidato rock glacierGEC-19024040-31.9000-70.18000.956.36
2019-11-18Candidato rock glacierGEC-19024040-31.9000-70.18000.956.55
2019-11-19Candidato rock glacierGEC-19024040-31.9000-70.18000.956.67
2019-11-20Candidato rock glacierGEC-19024040-31.9000-70.18000.956.95
2019-11-21Candidato rock glacierGEC-19024040-31.9000-70.18000.957.25
2019-11-22Candidato rock glacierGEC-19024040-31.9000-70.18000.957.60
2019-11-23Candidato rock glacierGEC-19024040-31.9000-70.18000.957.67
2019-11-24Candidato rock glacierGEC-19024040-31.9000-70.18000.957.79
2019-11-25Candidato rock glacierGEC-19024040-31.9000-70.18000.957.79
2019-11-26Candidato rock glacierGEC-19024040-31.9000-70.18000.957.27
2019-11-27Candidato rock glacierGEC-19024040-31.9000-70.18000.956.23
2019-11-28Candidato rock glacierGEC-19024040-31.9000-70.18000.955.76
2019-11-29Candidato rock glacierGEC-19024040-31.9000-70.18000.955.90
2019-11-30Candidato rock glacierGEC-19024040-31.9000-70.18000.955.98
2019-12-01Candidato rock glacierGEC-19024040-31.9000-70.18000.956.06
2019-12-02Candidato rock glacierGEC-19024040-31.9000-70.18000.956.37
2019-12-03Candidato rock glacierGEC-19024040-31.9000-70.18000.956.75
2019-12-04Candidato rock glacierGEC-19024040-31.9000-70.18000.956.93
2019-12-05Candidato rock glacierGEC-19024040-31.9000-70.18000.956.67
2019-12-06Candidato rock glacierGEC-19024040-31.9000-70.18000.956.48
2019-12-07Candidato rock glacierGEC-19024040-31.9000-70.18000.956.53
2019-12-08Candidato rock glacierGEC-19024040-31.9000-70.18000.956.60
2019-12-09Candidato rock glacierGEC-19024040-31.9000-70.18000.956.59
2019-12-10Candidato rock glacierGEC-19024040-31.9000-70.18000.956.82
2019-12-11Candidato rock glacierGEC-19024040-31.9000-70.18000.957.18
2019-12-12Candidato rock glacierGEC-19024040-31.9000-70.18000.957.41
2019-12-13Candidato rock glacierGEC-19024040-31.9000-70.18000.957.59
2019-12-14Candidato rock glacierGEC-19024040-31.9000-70.18000.958.03
2019-12-15Candidato rock glacierGEC-19024040-31.9000-70.18000.958.02
2019-12-16Candidato rock glacierGEC-19024040-31.9000-70.18000.957.60
2019-12-17Candidato rock glacierGEC-19024040-31.9000-70.18000.957.17
2019-12-18Candidato rock glacierGEC-19024040-31.9000-70.18000.957.12
2019-12-19Candidato rock glacierGEC-19024040-31.9000-70.18000.957.26
2019-12-20Candidato rock glacierGEC-19024040-31.9000-70.18000.957.48
2019-12-21Candidato rock glacierGEC-19024040-31.9000-70.18000.957.44
2019-12-22Candidato rock glacierGEC-19024040-31.9000-70.18000.957.54
2019-12-23Candidato rock glacierGEC-19024040-31.9000-70.18000.958.06
2019-12-24Candidato rock glacierGEC-19024040-31.9000-70.18000.958.39
2019-12-25Candidato rock glacierGEC-19024040-31.9000-70.18000.958.52
2019-12-26Candidato rock glacierGEC-19024040-31.9000-70.18000.958.74
2019-12-27Candidato rock glacierGEC-19024040-31.9000-70.18000.958.94
2019-12-28Candidato rock glacierGEC-19024040-31.9000-70.18000.959.17
2019-12-29Candidato rock glacierGEC-19024040-31.9000-70.18000.959.63
2019-12-30Candidato rock glacierGEC-19024040-31.9000-70.18000.959.92
2019-12-31Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.26
2020-01-01Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.05
2020-01-02Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.84
2020-01-03Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.89
2020-01-04Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.36
2020-01-05Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.46
2020-01-06Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.89
2020-01-07Candidato rock glacierGEC-19024040-31.9000-70.18000.959.99
2020-01-08Candidato rock glacierGEC-19024040-31.9000-70.18000.959.36
2020-01-09Candidato rock glacierGEC-19024040-31.9000-70.18000.958.73
2020-01-10Candidato rock glacierGEC-19024040-31.9000-70.18000.958.10
2020-01-11Candidato rock glacierGEC-19024040-31.9000-70.18000.957.86
2020-01-12Candidato rock glacierGEC-19024040-31.9000-70.18000.957.89
2020-01-13Candidato rock glacierGEC-19024040-31.9000-70.18000.958.08
2020-01-14Candidato rock glacierGEC-19024040-31.9000-70.18000.958.27
2020-01-15Candidato rock glacierGEC-19024040-31.9000-70.18000.958.66
2020-01-16Candidato rock glacierGEC-19024040-31.9000-70.18000.959.19
2020-01-17Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.61
2020-01-18Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.48
2020-01-19Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.61
2020-01-20Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.80
2020-01-21Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.94
2020-01-22Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.33
2020-01-23Candidato rock glacierGEC-19024040-31.9000-70.18000.9512.35
2020-01-24Candidato rock glacierGEC-19024040-31.9000-70.18000.9512.28
2020-01-25Candidato rock glacierGEC-19024040-31.9000-70.18000.9512.45
2020-01-26Candidato rock glacierGEC-19024040-31.9000-70.18000.9512.20
2020-01-27Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.88
2020-01-28Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.67
2020-01-29Candidato rock glacierGEC-19024040-31.9000-70.18000.9511.63
2020-01-30Candidato rock glacierGEC-19024040-31.9000-70.18000.9510.78
2020-01-31Candidato rock glacierGEC-19024040-31.9000-70.18000.959.67
2020-02-01Candidato rock glacierGEC-19024040-31.9000-70.18000.959.01
2020-02-02Candidato rock glacierGEC-19024040-31.9000-70.18000.958.59
2020-02-03Candidato rock glacierGEC-19024040-31.9000-70.18000.958.18
2020-02-04Candidato rock glacierGEC-19024040-31.9000-70.18000.958.12
2020-02-05Candidato rock glacierGEC-19024040-31.9000-70.18000.958.14
2020-02-06Candidato rock glacierGEC-19024040-31.9000-70.18000.958.08
2020-02-07Candidato rock glacierGEC-19024040-31.9000-70.18000.957.76
2020-02-08Candidato rock glacierGEC-19024040-31.9000-70.18000.957.56
2020-02-09Candidato rock glacierGEC-19024040-31.9000-70.18000.957.56
2020-02-10Candidato rock glacierGEC-19024040-31.9000-70.18000.957.90
2020-02-11Candidato rock glacierGEC-19024040-31.9000-70.18000.958.13
2020-02-12Candidato rock glacierGEC-19024040-31.9000-70.18000.958.34
2020-02-13Candidato rock glacierGEC-19024040-31.9000-70.18000.958.56
2020-02-14Candidato rock glacierGEC-19024040-31.9000-70.18000.958.74
2020-02-15Candidato rock glacierGEC-19024040-31.9000-70.18000.958.72
2020-02-16Candidato rock glacierGEC-19024040-31.9000-70.18000.958.71
2020-02-17Candidato rock glacierGEC-19024040-31.9000-70.18000.959.13
2020-02-18Candidato rock glacierGEC-19024040-31.9000-70.18000.959.32
2020-02-19Candidato rock glacierGEC-19024040-31.9000-70.18000.958.85
2020-02-20Candidato rock glacierGEC-19024040-31.9000-70.18000.958.63
2020-02-21Candidato rock glacierGEC-19024040-31.9000-70.18000.958.83
2020-02-22Candidato rock glacierGEC-19024040-31.9000-70.18000.959.31
2020-02-23Candidato rock glacierGEC-19024040-31.9000-70.18000.959.17
2020-02-24Candidato rock glacierGEC-19024040-31.9000-70.18000.959.05
2020-02-25Candidato rock glacierGEC-19024040-31.9000-70.18000.958.80
2020-02-26Candidato rock glacierGEC-19024040-31.9000-70.18000.958.34
2020-02-27Candidato rock glacierGEC-19024040-31.9000-70.18000.958.15
2020-02-28Candidato rock glacierGEC-19024040-31.9000-70.18000.958.12
2020-02-29Candidato rock glacierGEC-19024040-31.9000-70.18000.958.37
2020-03-01Candidato rock glacierGEC-19024040-31.9000-70.18000.958.91
2020-03-02Candidato rock glacierGEC-19024040-31.9000-70.18000.958.49