Ikari, Matt J; Wallace, L M; Rabinowitz, H S; Savage, H M; Hamling, I J; Kopf, Achim J (2020): Table 2. Southern Hikurangi SSE parameters [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.910574, In supplement to: Ikari, MJ et al. (2020): Observations of Laboratory and Natural Slow Slip Events: Hikurangi Subduction Zone, New Zealand. Geochemistry, Geophysics, Geosystems, 21(2), e2019GC008717, https://doi.org/10.1029/2019GC008717
Always quote citation above when using data! You can download the citation in several formats below.
Comment:
Vo = initial slip velocity (cm/yr), r = downdip half width (km), Mw = moment magnitude
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Other event | Other event | Ikari, Matt J | Event (Stage) and Year | ||
2 | Duration, number of days | Duration | days | Ikari, Matt J | ||
3 | Depth of maximum slip | Depth slip max | km | Ikari, Matt J | ||
4 | Slip | slip | mm | Ikari, Matt J | Maximum Slip D | |
5 | Stress drop | Δτ | kPa | Ikari, Matt J | ||
6 | Velocity | Vel | cm/a | Ikari, Matt J | Peak Slip Velocity | |
7 | Ratio | Ratio | Ikari, Matt J | Event V/Vo | ||
8 | Width | w | km | Ikari, Matt J | Downdip Width | |
9 | Ratio | Ratio | Ikari, Matt J | D/r | ||
10 | Magnitude | Magnitude | Ikari, Matt J | Mw | ||
11 | Reference/source | Reference | Ikari, Matt J |
License:
Creative Commons Attribution 4.0 International (CC-BY-4.0)
Size:
141 data points
Data
1 Other event (Event (Stage) and Year) | 2 Duration [days] | 3 Depth slip max [km] | 4 slip [mm] (Maximum Slip D) | 5 Δτ [kPa] | 6 Vel [cm/a] (Peak Slip Velocity) | 7 Ratio (Event V/Vo) | 8 w [km] (Downdip Width) | 9 Ratio (D/r) | 10 Magnitude (Mw) | 11 Reference |
---|---|---|---|---|---|---|---|---|---|---|
Kapiti 2003 | 202 | 53 | 200 | 111.3 | 36.1 | 24.1 | 48 | 8.3E-6 | 6.6 | Wallace and Beavan, 2010 |
Manawatu 2004 (stage 1) | 365 | 53 | 230 | 55.8 | 23.0 | 15.3 | 97 | 4.7E-6 | 6.9 | Wallace and Beavan, 2010 |
Manawatu 2004 (stage 2) | 60 | 50 | 200 | 39.6 | 121.7 | 81.1 | 104 | 3.8E-6 | 6.9 | Wallace and Beavan, 2010 |
Manawatu 2004 (stage 3) | 120 | 50 | 190 | 43.5 | 57.8 | 38.5 | 89 | 4.3E-6 | 6.8 | Wallace and Beavan, 2010 |
Manawatu 2004 total | 545 | 7.2 | ||||||||
Kapiti 2008 (stage 1) | 120 | 53 | 80 | 26.4 | 24.3 | 16.2 | 48 | 3.4E-6 | 6.3 | Wallace and Beavan, 2010 |
Kapiti 2008 (stage 2) | 60 | 53 | 270 | 128.7 | 164.3 | 109.5 | 69 | 7.9E-6 | 6.7 | Wallace and Beavan, 2010 |
Kapiti 2008 (stage 3) | 90 | 38 | 110 | 32.1 | 44.6 | 29.7 | 73 | 3.0E-6 | 6.6 | Wallace and Beavan, 2010 |
Kapiti 2008 (stage 4) | 180 | 38 | 60 | 24.6 | 12.2 | 8.1 | 60 | 2.0E-6 | 6.4 | Wallace and Beavan, 2010 |
Kapiti 2008 total | 450 | 7.0 | ||||||||
Manawatu 2010/11 (stage 1) | 90 | 53 | 55 | 11.1 | 22.3 | 14.9 | 81 | 1.4E-6 | 6.5 | Wallace et al., 2012 |
Manawatu 2010/11 (stage 2) | 120 | 38 | 160 | 31.8 | 48.7 | 32.4 | 95 | 3.4E-6 | 6.9 | Wallace et al., 2012 |
Manawatu 2010/11 (stage 3) | 240 | 38 | 90 | 23.1 | 13.7 | 9.1 | 83 | 2.2E-6 | 6.7 | Wallace et al., 2012 |
Manawatu 2010/11 total | 450 | 7.1 | ||||||||
Kapiti 2016 (still ongoing) | 300 | 45 | 220 | 53.7 | 26.8 | 17.8 | 88 | 5.0E-6 | 6.9 | Wallace et al., 2018 |