Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Raymo, Maureen E (1997): (Table 2) Termination depths and age estimations of various sediments cores [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.869102, In supplement to: Raymo, ME (1997): The timing of major climate terminations. Paleoceanography, 12(4), 577-585, https://doi.org/10.1029/97PA01169

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Related to:
Berger, Wolfgang H; Yasuda, Memorie K; Bickert, Torsten; Wefer, Gerold; Takayama, Toshiaki (1994): Quaternary time scale for the Ontong Java Plateau: Milankovitch template for Ocean Drilling Program Site 806. Geology, 22(5), 463-467, https://doi.org/10.1130/0091-7613(1994)022%3C0463:QTSFTO%3E2.3.CO;2
Other version:
NOAA/WDS Paleoclimatology - Raymo 1997 Major Climate Terminations Data (2003). NOAA National Centers for Environmental Information, https://doi.org/10.25921/5F4B-WT85
Project(s):
Coverage:
Median Latitude: 6.281012 * Median Longitude: -2.325566 * South-bound Latitude: -3.095000 * West-bound Longitude: -110.518330 * North-bound Latitude: 41.001200 * East-bound Longitude: 159.361000
Date/Time Start: 1971-05-09T00:00:00 * Date/Time End: 1994-02-14T00:00:00
Minimum DEPTH, sediment/rock: 0.21 m * Maximum DEPTH, sediment/rock: 34.95 m
Event(s):
94-607  * Latitude: 41.001200 * Longitude: -32.957300 * Date/Time: 1983-07-06T00:00:00 * Elevation: -3427.0 m * Penetration: 284.4 m * Recovery: 248.6 m * Location: North Atlantic/FLANK * Campaign: Leg94 * Basis: Glomar Challenger * Method/Device: Drilling/drill rig (DRILL) * Comment: 30 cores; 284.4 m cored; 0 m drilled; 87.4 % recovery
108-659  * Latitude: 18.077200 * Longitude: -21.026200 * Date/Time Start: 1986-03-09T00:00:00 * Date/Time End: 1986-03-12T00:00:00 * Elevation: -3082.3 m * Penetration: 671.9 m * Recovery: 411.2 m * Location: South Atlantic Ocean * Campaign: Leg108 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 59 cores; 551.9 m cored; 0 m drilled; 74.5% recovery
108-663  * Latitude: -1.197800 * Longitude: -11.878500 * Date/Time Start: 1986-03-26T00:00:00 * Date/Time End: 1986-03-28T00:00:00 * Elevation: -3706.0 m * Penetration: 299.2 m * Recovery: 272.6 m * Location: South Atlantic Ocean * Campaign: Leg108 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 32 cores; 299.2 m cored; 0 m drilled; 91.1% recovery
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Event labelEventRaymo, Maureen E
Latitude of eventLatitudeRaymo, Maureen E
Longitude of eventLongitudeRaymo, Maureen E
Elevation of eventElevationmRaymo, Maureen E
DEPTH, sediment/rockDepth sedmRaymo, Maureen EGeocode
Age modelAge modelkaRaymo, Maureen E
Age, commentCommRaymo, Maureen E
Size:
174 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Event

Latitude

Longitude

Elevation [m]

Depth sed [m]

Age model [ka]

Comm
108-659 18.0772-21.0262-30820.8713.5Termination I
108-65918.0772-21.0262-30824.31128.0Termination II
108-65918.0772-21.0262-30827.69234.8Termination III
108-65918.0772-21.0262-308210.76331.8Termination IV
108-65918.0772-21.0262-308213.88430.4Termination V
108-65918.0772-21.0262-308217.92558.0Termination VI
108-65918.0772-21.0262-308220.64643.9Termination VII
108-65918.0772-21.0262-308224.70772.2Stage 19
108-663 -1.1978-11.8785-37060.4013.5Termination I
108-663-1.1978-11.8785-37065.08128.0Termination II
108-663-1.1978-11.8785-37069.42240.3Termination III
108-663-1.1978-11.8785-370612.92330.9Termination IV
108-663-1.1978-11.8785-370616.57425.4Termination V
108-663-1.1978-11.8785-370621.03540.8Termination VI
108-663-1.1978-11.8785-370623.95616.4Termination VII
108-663-1.1978-11.8785-370629.97772.2Stage 19
108-664 0.1073-23.2275-38070.4513.5Termination I
108-6640.1073-23.2275-38074.69128.0Termination II
108-6640.1073-23.2275-38078.95242.5Termination III
108-6640.1073-23.2275-380712.37334.4Termination IV
108-6640.1073-23.2275-380715.73424.7Termination V
108-6640.1073-23.2275-380719.89536.5Termination VI
108-6640.1073-23.2275-380722.44605.0Termination VII
108-6640.1073-23.2275-380728.66772.2Stage 19
111-677 1.2020-83.7370-34720.7313.5Termination I
111-6771.2020-83.7370-34726.20128.0Termination II
111-6771.2020-83.7370-347210.74246.4Termination III
111-6771.2020-83.7370-347214.17335.9Termination IV
111-6771.2020-83.7370-347217.13413.1Termination V
111-6771.2020-83.7370-347221.38523.9Termination VI
111-6771.2020-83.7370-347224.36601.6Termination VII
111-6771.2020-83.7370-347230.90772.2Stage 19
130-806 0.3187159.3610-25200.4013.5Termination I
130-8060.3187159.3610-25202.70128.0Termination II
130-8060.3187159.3610-25205.21249.8Termination III
130-8060.3187159.3610-25206.99336.1Termination IV
130-8060.3187159.3610-25208.68418.1Termination V
130-8060.3187159.3610-252010.69515.6Termination VI
130-8060.3187159.3610-252012.91623.3Termination VII
130-8060.3187159.3610-252015.98772.2Stage 19
138-846 -3.0950-90.8183-32960.4613.5Termination I
138-846-3.0950-90.8183-32965.42128.0Termination II
138-846-3.0950-90.8183-32969.64244.6Termination III
138-846-3.0950-90.8183-329613.09340.0Termination IV
138-846-3.0950-90.8183-329616.23426.7Termination V
138-846-3.0950-90.8183-329620.60547.5Termination VI
138-846-3.0950-90.8183-329623.16618.3Termination VII
138-846-3.0950-90.8183-329628.73772.2Stage 19
138-849 0.1833-110.5183-38390.4513.5Termination I
138-8490.1833-110.5183-38394.08128.0Termination II
138-8490.1833-110.5183-38398.12269.3Termination III
138-8490.1833-110.5183-383910.84364.4Termination IV
138-8490.1833-110.5183-383913.16445.6Termination V
138-8490.1833-110.5183-383916.32556.1Termination VI
138-8490.1833-110.5183-383918.63636.9Termination VII
138-8490.1833-110.5183-383922.50772.2Stage 19
154-925 4.2042-43.4891-30520.3813.5Termination I
154-9254.2042-43.4891-30525.12128.0Termination II
154-9254.2042-43.4891-30529.54249.7Termination III
154-9254.2042-43.4891-305213.22351.1Termination IV
154-9254.2042-43.4891-305221.24572.0Termination VI
154-9254.2042-43.4891-305224.01648.3Termination VII
154-9254.2042-43.4891-305228.51772.2Stage 19
94-607 41.0012-32.9573-34270.7213.5Termination I
94-60741.0012-32.9573-34275.88128.0Termination II
94-60741.0012-32.9573-34279.22210.9Termination III
94-60741.0012-32.9573-342713.51317.4Termination IV
94-60741.0012-32.9573-342717.41414.2Termination V
94-60741.0012-32.9573-342720.57492.7Termination VI
94-60741.0012-32.9573-342724.45589.0Termination VII
94-60741.0012-32.9573-342731.83772.2Stage 19
MD90-963 5.040073.5300-24460.3013.5Termination I
MD90-9635.040073.5300-24467.70128.0Termination II
MD90-9635.040073.5300-244613.26259.4Termination III
MD90-9635.040073.5300-244617.26354.0Termination IV
MD90-9635.040073.5300-244620.87439.3Termination V
MD90-9635.040073.5300-244624.64528.5Termination VI
MD90-9635.040073.5300-244629.74649.0Termination VII
MD90-9635.040073.5300-244634.95772.2Stage 19
V28-239 3.2500159.1800-34900.2113.5Termination I
V28-2393.2500159.1800-34901.29128.0Termination II
V28-2393.2500159.1800-34902.34242.5Termination III
V28-2393.2500159.1800-34903.20336.2Termination IV
V28-2393.2500159.1800-34903.77398.3Termination V
V28-2393.2500159.1800-34904.78508.4Termination VI
V28-2393.2500159.1800-34905.67605.4Termination VII
V28-2393.2500159.1800-34907.20772.2Stage 19