Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Komor, Stephen C; Mottl, Michael J (2006): (Table T2) Oxygen, hydrogen, and carbon isotope compositions of pore water from ODP Site 195-1201 sediments [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.778546, In supplement to: Komor, SC; Mottl, MJ (2006): Data report: Pore water chemical and isotopic compositions from the West Philippine Basin, Ocean Drilling Program Site 1201. In: Shinohara, M; Salisbury, MH; Richter, C (eds.) Proceedings of the Ocean Drilling Program, Scientific Results, College Station, TX (Ocean Drilling Program), 195, 1-14, https://doi.org/10.2973/odp.proc.sr.195.110.2006

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Project(s):
Coverage:
Median Latitude: 19.297660 * Median Longitude: 135.099180 * South-bound Latitude: 19.296950 * West-bound Longitude: 135.099160 * North-bound Latitude: 19.298050 * East-bound Longitude: 135.099200
Date/Time Start: 2001-03-31T16:00:00 * Date/Time End: 2001-04-14T01:30:00
Minimum DEPTH, sediment/rock: 1.26 m * Maximum DEPTH, sediment/rock: 504.80 m
Event(s):
195-1201A  * Latitude: 19.298050 * Longitude: 135.099160 * Date/Time Start: 2001-03-31T16:00:00 * Date/Time End: 2001-04-01T15:45:00 * Elevation: -5709.9 m * Penetration: 1.6 m * Recovery: 1.49 m * Location: Philippine Sea * Campaign: Leg195 * Basis: Joides Resolution * Method/Device: Drilling/drill rig (DRILL) * Comment: 1 core; 1.6 m cored; 0 m drilled; 93.1 % recovery
195-1201B  * Latitude: 19.297980 * Longitude: 135.099180 * Date/Time Start: 2001-04-01T15:45:00 * Date/Time End: 2001-04-02T18:15:00 * Elevation: -5710.2 m * Penetration: 90.3 m * Recovery: 65.91 m * Location: Philippine Sea * Campaign: Leg195 * Basis: Joides Resolution * Method/Device: Drilling/drill rig (DRILL) * Comment: 11 core; 90.3 m cored; 0 m drilled; 73 % recovery
195-1201D  * Latitude: 19.296950 * Longitude: 135.099200 * Date/Time Start: 2001-04-05T07:15:00 * Date/Time End: 2001-04-14T01:30:00 * Elevation: -5708.7 m * Penetration: 600 m * Recovery: 406.79 m * Location: Philippine Sea * Campaign: Leg195 * Basis: Joides Resolution * Method/Device: Drilling/drill rig (DRILL) * Comment: 55 cores; 519.6 m cored; 80.4 m drilled; 78.3 % recovery
Comment:
Sediment depth is given in mbsf. Errors of the isotopic analyses are 0.1 per mil for d18O, D and d13C.
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Event labelEvent
Sample code/labelSample labelKomor, Stephen C
DEPTH, sediment/rockDepth sedmGeocode
δ18O, waterδ18O H2O‰ SMOWKomor, Stephen C
δ DeuteriumδD‰ SMOWKomor, Stephen C
δ13C, dissolved inorganic carbonδ13C DIC‰ PDBKomor, Stephen C
Size:
140 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Event

Sample label

Depth sed [m]

δ18O H2O [‰ SMOW]

δD [‰ SMOW]

δ13C DIC [‰ PDB]
195-1201A 195-1201A-1H-11.26-0.71-0.26
195-1201B 195-1201B-1H-11.50-0.48-0.31
195-1201B195-1201B-1H-34.50-0.901.56
195-1201B195-1201B-1H-46.00-0.642.57
195-1201B195-1201B-2H-18.70-0.562.90
195-1201B195-1201B-2H-311.70-0.480.33
195-1201B195-1201B-2H-514.70-0.631.22
195-1201B195-1201B-2H-717.11-0.501.85
195-1201B195-1201B-3H-118.20-0.402.75
195-1201B195-1201B-3H-321.20-0.163.59-1.95
195-1201B195-1201B-3H-524.20-0.444.52-1.97
195-1201B195-1201B-3H-726.32-0.404.79
195-1201B195-1201B-4H-127.70-0.644.45-2.23
195-1201B195-1201B-4H-330.70-0.544.93
195-1201B195-1201B-4H-533.70-0.835.25-2.20
195-1201B195-1201B-4H-735.97-0.654.89-2.34
195-1201B195-1201B-5H-137.20-0.695.66-2.54
195-1201B195-1201B-5H-340.20-1.012.88-2.46
195-1201B195-1201B-5H-543.20-0.981.67-2.42
195-1201B195-1201B-5H-745.25-1.051.73-2.73
195-1201B195-1201B-6H-146.50-0.801.03-3.10
195-1201B195-1201B-7X-351.20-0.890.75-2.49
195-1201B195-1201B-8X-356.40-0.92-0.06-3.37
195-1201D 195-1201D-7R-CC146.98-2.61-1.84
195-1201D195-1201D-8R-4153.21-2.56-2.26
195-1201D195-1201D-9R-4163.14-2.24-0.89
195-1201D195-1201D-11R-5183.41-2.66-2.11
195-1201D195-1201D-13R-3199.66-2.77-2.19
195-1201D195-1201D-17R-3238.04-3.17-3.85
195-1201D195-1201D-20R-3267.16-3.45-3.61
195-1201D195-1201D-22R-1283.71-3.59-3.43
195-1201D195-1201D-23R-3296.08-3.66-3.30-7.50
195-1201D195-1201D-24R-1302.88-3.77-5.48
195-1201D195-1201D-26R-2323.54-3.86-3.94-11.65
195-1201D195-1201D-27R-3334.22-4.13-4.76
195-1201D195-1201D-28R-6347.97-4.60-5.89
195-1201D195-1201D-30R-1360.60-4.36-5.58
195-1201D195-1201D-32R-4383.96-4.39-5.83
195-1201D195-1201D-33R-3408.504.82-6.56
195-1201D195-1201D-38R-1437.27-5.35-6.60
195-1201D195-1201D-44R-1495.20-4.18-5.36
195-1201D195-1201D-45R-1504.80-3.64-4.18