Expedition 325 Scientists (2011): Core summary for Hole 325-M0031A [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.762579
Always quote citation above when using data! You can download the citation in several formats below.
Related to:
Webster, Jody M; Yokoyama, Yusuke; Cotterill, Carol; Expedition 325 Scientists (2011): Proceedings of the Integrated Ocean Drilling Program. Tokyo (Integrated Ocean Drilling Program Management International, Inc.), 325, https://doi.org/10.2204/iodp.proc.325.2011
Project(s):
Coverage:
Latitude: -19.678950 * Longitude: 150.239610
Date/Time Start: 2010-02-14T08:30:00 * Date/Time End: 2010-02-14T08:30:00
Minimum Elevation: -92.0 m * Maximum Elevation: -90.1 m
Event(s):
325-M0031A (HYD_01Csite6) * Latitude: -19.678950 * Longitude: 150.239610 * Date/Time: 2010-02-14T08:30:00 * Elevation Start: -92.0 m * Elevation End: -90.1 m * Penetration: 43 m * Recovery: 5.68 m * Location: Great Barrier Reef, Australia * Campaign: Exp325 (Great Barrier Reef Environmental Changes) * Basis: Greatship Maya * Method/Device: Drilling/drill rig (DRILL) * Comment: Drilling Depth Methods: DSF: tag sea floor; CSF: let overlap if long; CCSF: let overlap if long. Elevation Start = drill string tagging seabed including predicted tidal variations, Elevation End = corrected EM300 echo sounder data.
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Sample code/label | Sample label | Expedition 325 Scientists | |||
2 | Section Top in meters below surface | Top | mbsf | Expedition 325 Scientists | Top of first section = top of core | |
3 | Drilled | Drilled | m | Expedition 325 Scientists | ||
4 | Cumulative Offset | Cum Offset | m | Expedition 325 Scientists | ||
5 | Recovery | Recovery | m | Expedition 325 Scientists | ||
6 | Recovery | Recovery | % | Expedition 325 Scientists | ||
7 | Date/time end | Date/time end | Expedition 325 Scientists | core on deck | ||
8 | Comment | Comment | Expedition 325 Scientists |
License:
Creative Commons Attribution 3.0 Unported (CC-BY-3.0)
Size:
133 data points
Data
1 Sample label | 2 Top [mbsf] | 3 Drilled [m] | 4 Cum Offset [m] | 5 Recovery [m] | 6 Recovery [%] | 7 Date/time end | 8 Comment |
---|---|---|---|---|---|---|---|
325-M0031A-1R | 0.00 | 3.00 | 0 | 0.00 | 0.0 | 2010-02-14T18:25 | empty liner |
325-M0031A-2R | 3.00 | 3.00 | 0 | 0.42 | 14.0 | 2010-02-14T19:45 | DATE sample taken |
325-M0031A-3R | 6.00 | 3.00 | 0 | 0.43 | 14.3 | 2012-02-14T20:35 | |
325-M0031A-4R | 9.00 | 3.00 | 0 | 0.24 | 8.0 | 2012-02-14T23:35 | cc and sect.1 material transferred into new liner |
325-M0031A-5R | 12.00 | 0.00 | 0 | 0.00 | 0.0 | 2010-02-15T01:30 | no advance |
325-M0031A-6W | 8.60 | 3.40 | 0 | 0.16 | 4.7 | 2010-02-15T03:30 | wash core - reaming |
325-M0031A-7R | 12.00 | 3.00 | 0 | 0.24 | 8.0 | 2010-02-15T08:30 | |
325-M0031A-8R | 15.00 | 3.00 | 0 | 0.55 | 18.3 | 2010-02-15T09:30 | DATE sample taken |
325-M0031A-9R | 18.00 | 2.50 | 0 | 0.17 | 6.8 | 2010-02-15T12:00 | cc and sect.1 material transferred into new liner |
325-M0031A-10R | 20.50 | 3.00 | 0 | 0.40 | 13.3 | 2010-02-15T13:00 | HS, IWRH |
325-M0031A-11R | 23.50 | 3.00 | 0 | 0.25 | 8.3 | 2010-02-15T13:40 | cc and sect.1 material transferred into new liner |
325-M0031A-12R | 26.50 | 1.50 | 0 | 0.33 | 22.0 | 2010-02-15T15:40 | first time split spoon (AL) was used. |
325-M0031A-13R | 28.00 | 3.00 | 0 | 1.56 | 52.0 | 2010-02-15T18:30 | split spoon used |
325-M0031A-14R | 31.00 | 3.00 | 0 | 0.19 | 6.3 | 2010-02-15T19:30 | |
325-M0031A-15R | 34.00 | 3.00 | 0 | 0.25 | 8.3 | 2010-02-15T20:20 | cc (one solid piece at bot.) and sect.1 material transferred into new liner |
325-M0031A-16R | 37.00 | 3.00 | 0 | 0.05 | 1.7 | 2010-02-15T23:10 | DATE sample taken |
325-M0031A-17R | 40.00 | 3.00 | 0 | 0.44 | 14.7 | 2010-02-16T01:50 | split spoon used |