Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Vedernikov, Vladimir I; Demidov, A B (1996): (Table 2) Hydrolytic enzyme activity and some production characteristics of phytoplankton in the Black Sea in autumn 1992 [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.759839, In supplement to: Vedernikov, Vladimir I; Demidov, A B; Korneeva, Galina A (1996): Some features of distribution of phytoplankton production characteristics and rate of hydrolysis of natural polymers in the Black Sea in autumn. Qceanology (Translated from Okeanologiya, 1996, 36(2), 250-259), 36(2), 231-240

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Project(s):
Coverage:
Median Latitude: 43.974359 * Median Longitude: 34.717949 * South-bound Latitude: 42.333333 * West-bound Longitude: 30.000000 * North-bound Latitude: 45.716667 * East-bound Longitude: 39.416667
Date/Time Start: 1992-09-28T00:00:00 * Date/Time End: 1992-10-14T00:00:00
Minimum Elevation: -2190.0 m * Maximum Elevation: -25.0 m
Event(s):
Vy26-3785  * Latitude: 44.450000 * Longitude: 37.916667 * Date/Time: 1992-09-28T00:00:00 * Elevation: -1300.0 m * Location: Black Sea * Method/Device: Transparent bottle 150L (TRANS150)
Vy26-3793  * Latitude: 44.000000 * Longitude: 37.416667 * Date/Time: 1992-09-29T00:00:00 * Elevation: -2100.0 m * Location: Black Sea * Method/Device: Transparent bottle 150L (TRANS150)
Vy26-3794  * Latitude: 42.333333 * Longitude: 39.416667 * Date/Time: 1992-10-01T00:00:00 * Elevation: -1950.0 m * Location: Black Sea * Method/Device: Transparent bottle 150L (TRANS150)
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Event labelEvent
Latitude of eventLatitude
Longitude of eventLongitude
Elevation of eventElevationm
Date/Time of eventDate/Time
Primary production of carbon per area, dailyPP C areag/m2/dayVedernikov, Vladimir I14C in-situ incubationin the surface layer
Primary production of carbon per area, dailyPP C areag/m2/dayVedernikov, Vladimir ICalculatedin the water column
Chlorophyll aChl aµg/lVedernikov, Vladimir ISpectrophotometryin the surface layer
Chlorophyll aChl aµg/lVedernikov, Vladimir ISpectrophotometryin the photosynthesis layer, average
10 Chlorophyll aChl aµg/lVedernikov, Vladimir ISpectrophotometryin the water column, average
11 CommentCommentVedernikov, Vladimir I
12 Assimilation rate of carbon per chlorophyll aAssim r C/Chl amg/mg/hVedernikov, Vladimir ICalculatedmaximum in the water column
13 Assimilation rate of carbon per chlorophyll aAssim r C/Chl amg/mg/hVedernikov, Vladimir ICalculatedaverage for the photosynthetic layer
14 Photosynthesis layer, thicknessTPhlmVedernikov, Vladimir I
15 Hydrolytic enzyme activityHEAe.u./lVedernikov, Vladimir IHydrolysis of starch dyed with procion-M 5CXfor the photosynthesis layer, average
16 Hydrolytic enzyme activityHEAe.u./lVedernikov, Vladimir IHydrolysis of starch dyed with procion-M 5CXfor the water column, average
17 Hydrolytic enzyme activityHEAe.u./lVedernikov, Vladimir IHydrolysis of starch dyed with procion-M 5CXfor the uppermost mixed layer, average
18 Hydrolytic enzyme activityHEAe.u./lVedernikov, Vladimir IHydrolysis of starch dyed with procion-M 5CXfor the photosynthesis layer, total
19 RatioRatioVedernikov, Vladimir ICalculatedtotal HEA / primary production, for the photosynthesis layer
Size:
167 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Event

Latitude

Longitude

Elevation [m]

Date/Time

PP C area [g/m2/day]
(in the surface layer, 14C in-...)

PP C area [g/m2/day]
(in the water column, Calculated)

Chl a [µg/l]
(in the surface layer, Spectro...)

Chl a [µg/l]
(in the photosynthesis layer, ...)
10 
Chl a [µg/l]
(in the water column, average,...)
11 
Comment
12 
Assim r C/Chl a [mg/mg/h]
(maximum in the water column, ...)
13 
Assim r C/Chl a [mg/mg/h]
(average for the photosyntheti...)
14 
TPhl [m]
15 
HEA [e.u./l]
(for the photosynthesis layer,...)
16 
HEA [e.u./l]
(for the water column, average...)
17 
HEA [e.u./l]
(for the uppermost mixed layer...)
18 
HEA [e.u./l]
(for the photosynthesis layer,...)
19 
Ratio
(total HEA / primary productio...)
Vy26-3785 44.45037.917-13001992-09-280.02470.3270.690.580.40Chl a from 0 m to 100 m3.180.955020.526.036.210253.130
Vy26-3793 44.00037.417-21001992-09-290.01160.2630.400.470.26Chl a from 0 m to 100 m2.520.9650
Vy26-3794 42.33339.417-19501992-10-010.02280.3000.630.660.31Chl a from 0 m to 100 m3.131.1235102.665.1123.9359111.970
Vy26-3795 42.75038.167-21301992-10-020.01230.1030.600.620.25Chl a from 0 m to 100 m1.770.413553.044.6123.1185518.010
Vy26-3797 43.33337.000-21601992-10-030.02210.2730.600.650.35Chl a from 0 m to 100 m3.200.7350
Vy26-3826 43.75036.017-21301992-10-140.01970.3240.740.570.32Chl a from 0 m to 100 m2.861.045014.38.218.57152.210
Vy26-3801 43.33334.067-21901992-10-050.01720.1350.510.640.32Chl a from 0 m to 100 m2.970.414513.927.017.86264.640
Vy26-3822 44.01734.150-20501992-10-130.01620.3740.760.460.27Chl a from 0 m to 100 m2.261.4850
Vy26-3804 43.50032.183-19401992-10-060.02180.2560.680.460.25Chl a from 0 m to 100 m2.830.985029.225.021.811104.330
Vy26-3810 45.33330.000-251992-10-080.28591.1992.894.934.93Chl a from 0 m to the bottom8.851.0920366.5366.5366.573306.110
Vy26-3811 45.71731.167-371992-10-080.16590.5652.642.732.01Chl a from 0 m to the bottom5.640.9320208.5159.7211.741707.380
Vy26-3818 44.48331.500-8501992-10-100.03120.5000.960.750.39Chl a from 0 m to 100 m3.071.344521.224.018.99531.910
Vy26-3819 44.66732.333-9001992-10-110.04490.3220.970.870.38Chl a from 0 m to 100 m4.210.993440.847.045.613874.320