Expedition 310 Scientists (2007): Core summary for Hole 310-M0025B [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.552124
Always quote citation above when using data! You can download the citation in several formats below.
Related to:
Camoin, Gilbert; Iryu, Yasufumi; McInroy, Dave; Expedition 310 Scientists (2007): Proceedings of the Integrated Ocean Drilling Program. Washington, DC (Integrated Ocean Drilling Program Management, Inc.), 310, https://doi.org/10.2204/iodp.proc.310.2007
Project(s):
Coverage:
Latitude: -17.488100 * Longitude: -149.404150
Date/Time Start: 2005-11-14T13:58:00 * Date/Time End: 2005-11-15T00:43:00
Minimum Elevation: -100.8 m * Maximum Elevation: -100.8 m
Event(s):
310-M0025B (TAH-02A-5H) * Latitude: -17.488100 * Longitude: -149.404150 * Date/Time Start: 2005-11-14T13:58:00 * Date/Time End: 2005-11-15T00:43:00 * Elevation: -100.8 m * Penetration: 20.5 m * Recovery: 13.81 m * Location: Tahiti, offshore Tiarei * Campaign: Exp310 (Tahiti Sea Level) * Basis: DP Hunter * Method/Device: Drilling/drill rig (DRILL) * Comment: Coordinate system: WGS84, Time zone: UTC -10
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Sample code/label | Sample label | Expedition 310 Scientists | |||
2 | Section Top in meters below surface | Top | mbsf | Expedition 310 Scientists | top of first section = top of core | |
3 | Cumulative Offset | Cum Offset | m | Expedition 310 Scientists | ||
4 | Interval Cored | Cored | m | Expedition 310 Scientists | ||
5 | Recovery | Recovery | m | Expedition 310 Scientists | ||
6 | Recovery | Recovery | % | Expedition 310 Scientists | ||
7 | Comment | Comment | Expedition 310 Scientists |
License:
Creative Commons Attribution 3.0 Unported (CC-BY-3.0)
Size:
91 data points
Data
1 Sample label | 2 Top [mbsf] | 3 Cum Offset [m] | 4 Cored [m] | 5 Recovery [m] | 6 Recovery [%] | 7 Comment |
---|---|---|---|---|---|---|
310-M0025B-1R | 1.10 | 0 | 1.16 | 0.91 | 78.4 | split barrel, material placed into liner on drillfloor; ATP @ 6 cm |
310-M0025B-2R | 2.26 | 0 | 1.50 | 1.53 | 102.0 | split barrel, material placed into liner on drillfloor |
310-M0025B-3R | 3.76 | 0 | 0.22 | 0.21 | 95.4 | split barrel, material placed into liner on drillfloor |
310-M0025B-4R | 3.98 | 0 | 1.23 | 1.05 | 85.4 | split barrel, material placed into liner on drillfloor |
310-M0025B-5R | 5.21 | 0 | 3.00 | 0.77 | 25.7 | split barrel, material placed into liner on drillfloor |
310-M0025B-6R | 8.21 | 0 | 1.50 | 1.15 | 76.7 | split barrel, material placed into liner on drillfloor |
310-M0025B-7R | 9.71 | 0 | 0.63 | 0.91 | 144.4 | split barrel, material placed into liner on drillfloor |
310-M0025B-8R | 10.34 | 0 | 1.63 | 1.65 | 101.2 | split barrel, material placed into liner on drillfloor |
310-M0025B-9R | 11.97 | 0 | 2.03 | 1.80 | 88.7 | split barrel, material placed into liner on drillfloor |
310-M0025B-10R | 14.00 | 0 | 1.95 | 0.73 | 37.4 | split barrel, material placed into liner on drillfloor |
310-M0025B-11R | 15.95 | 0 | 1.55 | 1.01 | 65.2 | split barrel, material placed into liner on drillfloor |
310-M0025B-12R | 17.50 | 0 | 1.50 | 0.82 | 54.7 | split barrel, material placed into liner on drillfloor |
310-M0025B-13R | 19.00 | 0 | 1.50 | 1.27 | 84.7 | split barrel, material placed into liner on drillfloor |