Expedition 310 Scientists (2007): Core summary for Hole 310-M0021B [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.552118
Always quote citation above when using data! You can download the citation in several formats below.
Related to:
Camoin, Gilbert; Iryu, Yasufumi; McInroy, Dave; Expedition 310 Scientists (2007): Proceedings of the Integrated Ocean Drilling Program. Washington, DC (Integrated Ocean Drilling Program Management, Inc.), 310, https://doi.org/10.2204/iodp.proc.310.2007
Project(s):
Coverage:
Latitude: -17.489040 * Longitude: -149.402820
Date/Time Start: 2005-11-15T02:48:00 * Date/Time End: 2005-11-15T17:07:00
Minimum Elevation: -81.7 m * Maximum Elevation: -81.7 m
Event(s):
310-M0021B (TAH-02A-5I) * Latitude: -17.489040 * Longitude: -149.402820 * Date/Time Start: 2005-11-15T02:48:00 * Date/Time End: 2005-11-15T17:07:00 * Elevation: -81.7 m * Penetration: 32.81 m * Recovery: 21.12 m * Location: Tahiti, offshore Tiarei * Campaign: Exp310 (Tahiti Sea Level) * Basis: DP Hunter * Method/Device: Drilling/drill rig (DRILL) * Comment: Coordinate system: WGS84, Time zone: UTC -10
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Sample code/label | Sample label | Expedition 310 Scientists | |||
2 | Section Top in meters below surface | Top | mbsf | Expedition 310 Scientists | top of first section = top of core | |
3 | Cumulative Offset | Cum Offset | m | Expedition 310 Scientists | ||
4 | Interval Cored | Cored | m | Expedition 310 Scientists | ||
5 | Recovery | Recovery | m | Expedition 310 Scientists | ||
6 | Recovery | Recovery | % | Expedition 310 Scientists | ||
7 | Comment | Comment | Expedition 310 Scientists |
License:
Creative Commons Attribution 3.0 Unported (CC-BY-3.0)
Size:
140 data points
Data
1 Sample label | 2 Top [mbsf] | 3 Cum Offset [m] | 4 Cored [m] | 5 Recovery [m] | 6 Recovery [%] | 7 Comment |
---|---|---|---|---|---|---|
310-M0021B-1R | 0.60 | 0 | 1.50 | 1.31 | 87.3 | split barrel, material placed into liner on drillfloor -- ATP + MBIO @ 1 cm |
310-M0021B-2R | 2.10 | 0 | 1.73 | 1.40 | 80.9 | split barrel, material placed into liner on drillfloor |
310-M0021B-3R | 3.83 | 0 | 1.99 | 1.89 | 95.0 | split barrel, material placed into liner on drillfloor |
310-M0021B-4R | 5.82 | 0 | 1.79 | 1.39 | 77.6 | split barrel, material placed into liner on drillfloor -- ATP + MBIO @ 106 cm |
310-M0021B-5R | 7.61 | 0 | 1.13 | 0.96 | 85.0 | split barrel, material placed into liner on drillfloor |
310-M0021B-6R | 8.74 | 0 | 1.82 | 1.85 | 101.6 | split barrel, material placed into liner on drillfloor |
310-M0021B-7R | 10.56 | 0 | 1.91 | 1.53 | 80.1 | split barrel, material placed into liner on drillfloor -- ATP + MBIO @ 28 cm |
310-M0021B-8R | 12.47 | 0 | 1.50 | 0.94 | 62.7 | split barrel, material placed into liner on drillfloor |
310-M0021B-9R | 13.97 | 0 | 2.28 | 0.74 | 32.5 | split barrel, material placed into liner on drillfloor |
310-M0021B-10R | 16.25 | 0 | 2.00 | 0.38 | 19.0 | Split barrel, material placed into liner on drillfloor |
310-M0021B-11R | 18.25 | 0 | 1.50 | 0.56 | 37.3 | Split barrel, material placed into liner on drillfloor |
310-M0021B-12R | 19.75 | 0 | 1.50 | 0.68 | 45.3 | Split barrel, material placed into liner on drillfloor |
310-M0021B-13R | 21.25 | 0 | 0.97 | 0.55 | 56.7 | Split barrel, material placed into liner on drillfloor |
310-M0021B-14R | 22.22 | 0 | 1.59 | 0.40 | 25.2 | Split barrel, material placed into liner on drillfloor |
310-M0021B-15R | 23.81 | 0 | 1.29 | 0.84 | 65.1 | Split barrel, material placed into liner on drillfloor |
310-M0021B-16R | 25.10 | 0 | 1.50 | 0.81 | 54.0 | Split barrel, material placed into liner on drillfloor |
310-M0021B-17R | 26.60 | 0 | 1.50 | 0.57 | 38.0 | Split barrel, material placed into liner on drillfloor |
310-M0021B-18R | 28.10 | 0 | 1.12 | 0.97 | 86.6 | Split barrel, material placed into liner on drillfloor |
310-M0021B-19R | 29.22 | 0 | 0.58 | 0.55 | 94.8 | Split barrel, material placed into liner on drillfloor |
310-M0021B-20R | 29.80 | 0 | 3.01 | 2.80 | 93.0 | Split barrel, material placed into liner on drillfloor |