Expedition 310 Scientists (2007): Core summary for Hole 310-M0021A [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.552117
Always quote citation above when using data! You can download the citation in several formats below.
Related to:
Camoin, Gilbert; Iryu, Yasufumi; McInroy, Dave; Expedition 310 Scientists (2007): Proceedings of the Integrated Ocean Drilling Program. Washington, DC (Integrated Ocean Drilling Program Management, Inc.), 310, https://doi.org/10.2204/iodp.proc.310.2007
Project(s):
Coverage:
Latitude: -17.489010 * Longitude: -149.402810
Date/Time Start: 2005-11-06T16:13:00 * Date/Time End: 2005-11-07T22:43:00
Minimum Elevation: -82.3 m * Maximum Elevation: -82.3 m
Event(s):
310-M0021A (TAH-02A-5D) * Latitude: -17.489010 * Longitude: -149.402810 * Date/Time Start: 2005-11-07T22:43:00 * Date/Time End: 2005-11-06T16:13:00 * Elevation: -82.3 m * Penetration: 34.23 m * Recovery: 25.14 m * Location: Tahiti, offshore Tiarei * Campaign: Exp310 (Tahiti Sea Level) * Basis: DP Hunter * Method/Device: Drilling/drill rig (DRILL) * Comment: Coordinate system: WGS84, Time zone: UTC -10
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Sample code/label | Sample label | Expedition 310 Scientists | |||
2 | Section Top in meters below surface | Top | mbsf | Expedition 310 Scientists | top of first section = top of core | |
3 | Cumulative Offset | Cum Offset | m | Expedition 310 Scientists | ||
4 | Interval Cored | Cored | m | Expedition 310 Scientists | ||
5 | Recovery | Recovery | m | Expedition 310 Scientists | ||
6 | Recovery | Recovery | % | Expedition 310 Scientists | ||
7 | Comment | Comment | Expedition 310 Scientists |
License:
Creative Commons Attribution 3.0 Unported (CC-BY-3.0)
Size:
154 data points
Data
1 Sample label | 2 Top [mbsf] | 3 Cum Offset [m] | 4 Cored [m] | 5 Recovery [m] | 6 Recovery [%] | 7 Comment |
---|---|---|---|---|---|---|
310-M0021A-1R | 0.65 | 0 | 1.35 | 0.95 | 70.4 | split barrel, material placed into liner on drillfloor -- ATP + MBIO @ 34 cm - surface |
310-M0021A-2R | 2.00 | 0 | 1.50 | 1.07 | 71.3 | split barrel, material placed into liner on drillfloor -- ATP @ 3 cm |
310-M0021A-3R | 3.50 | 0 | 0.81 | 0.90 | 111.1 | split barrel, material placed into liner on drillfloor -- ATP @ 38 cm |
310-M0021A-4R | 4.31 | 0 | 1.86 | 1.87 | 100.5 | split barrel, material placed into liner on drillfloor -- ATP @ 22 cm |
310-M0021A-5R | 6.17 | 0 | 2.03 | 2.04 | 100.5 | split barrel, material placed into liner on drillfloor |
310-M0021A-6R | 8.20 | 0 | 2.05 | 1.78 | 86.8 | split barrel, material placed into liner on drillfloor |
310-M0021A-7R | 10.25 | 0 | 1.96 | 1.71 | 87.2 | split barrel, material placed into liner on drillfloor |
310-M0021A-8R | 12.21 | 0 | 1.28 | 1.16 | 90.6 | split barrel, material placed into liner on drillfloor |
310-M0021A-9R | 13.49 | 0 | 1.19 | 0.98 | 82.4 | split barrel, material placed into liner on drillfloor |
310-M0021A-10R | 14.68 | 0 | 1.46 | 1.31 | 89.7 | split barrel, material placed into liner on drillfloor |
310-M0021A-11R | 16.14 | 0 | 1.26 | 0.68 | 54.0 | split barrel, material placed into liner on drillfloor |
310-M0021A-12R | 17.40 | 0 | 1.23 | 0.98 | 79.7 | split barrel, material placed into liner on drillfloor |
310-M0021A-13R | 18.63 | 0 | 2.87 | 1.71 | 59.6 | split barrel, material placed into liner on drillfloor |
310-M0021A-14R | 21.50 | 0 | 1.44 | 0.59 | 41.0 | split barrel, material placed into liner on drillfloor |
310-M0021A-15R | 22.94 | 0 | 1.22 | 0.60 | 49.2 | split barrel, material placed into liner on drillfloor |
310-M0021A-16R | 24.16 | 0 | 0.98 | 1.11 | 113.3 | split barrel, material placed into liner on drillfloor |
310-M0021A-17R | 25.14 | 0 | 1.26 | 0.90 | 71.4 | split barrel, material placed into liner on drillfloor |
310-M0021A-18R | 26.40 | 0 | 1.86 | 1.02 | 54.8 | split barrel, material placed into liner on drillfloor |
310-M0021A-19R | 28.26 | 0 | 1.50 | 1.05 | 70.0 | split barrel, material placed into liner on drillfloor |
310-M0021A-20R | 29.76 | 0 | 1.50 | 0.45 | 30.0 | split barrel, material placed into liner on drillfloor |
310-M0021A-21R | 31.26 | 0 | 1.50 | 0.65 | 43.3 | split barrel, material placed into liner on drillfloor |
310-M0021A-22R | 32.76 | 0 | 1.47 | 1.63 | 110.9 | split barrel, material placed into liner on drillfloor |