Expedition 310 Scientists (2007): Core summary for Hole 310-M0015B [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.552110
Always quote citation above when using data! You can download the citation in several formats below.
Related to:
Camoin, Gilbert; Iryu, Yasufumi; McInroy, Dave; Expedition 310 Scientists (2007): Proceedings of the Integrated Ocean Drilling Program. Washington, DC (Integrated Ocean Drilling Program Management, Inc.), 310, https://doi.org/10.2204/iodp.proc.310.2007
Project(s):
Coverage:
Latitude: -17.767390 * Longitude: -149.547430
Date/Time Start: 2005-10-31T15:10:00 * Date/Time End: 2005-11-01T17:10:00
Minimum Elevation: -72.3 m * Maximum Elevation: -72.3 m
Event(s):
310-M0015B (TAH-03A-1C) * Latitude: -17.767390 * Longitude: -149.547430 * Date/Time Start: 2005-10-31T15:10:00 * Date/Time End: 2005-11-01T17:10:00 * Elevation: -72.3 m * Penetration: 40.12 m * Recovery: 28.83 m * Location: Tahiti, offshore Maraa * Campaign: Exp310 (Tahiti Sea Level) * Basis: DP Hunter * Method/Device: Drilling/drill rig (DRILL) * Comment: Coordinate system: WGS84, Time zone: UTC -10
Parameter(s):
# | Name | Short Name | Unit | Principal Investigator | Method/Device | Comment |
---|---|---|---|---|---|---|
1 | Sample code/label | Sample label | Expedition 310 Scientists | |||
2 | Section Top in meters below surface | Top | mbsf | Expedition 310 Scientists | top of first section = top of core | |
3 | Cumulative Offset | Cum Offset | m | Expedition 310 Scientists | ||
4 | Interval Cored | Cored | m | Expedition 310 Scientists | ||
5 | Recovery | Recovery | m | Expedition 310 Scientists | ||
6 | Recovery | Recovery | % | Expedition 310 Scientists | ||
7 | Comment | Comment | Expedition 310 Scientists |
License:
Creative Commons Attribution 3.0 Unported (CC-BY-3.0)
Size:
247 data points
Data
1 Sample label | 2 Top [mbsf] | 3 Cum Offset [m] | 4 Cored [m] | 5 Recovery [m] | 6 Recovery [%] | 7 Comment |
---|---|---|---|---|---|---|
310-M0015B-1R | 0.00 | 0 | 0.47 | 0.40 | 85.1 | mudline - ATP @ 7 cm |
310-M0015B-2R | 0.47 | 0 | 1.51 | 0.85 | 56.3 | ATP @ 0, 48 cm + MBIO @ 0 cm (5cc) |
310-M0015B-3R | 1.98 | 0 | 1.50 | 0.47 | 31.3 | |
310-M0015B-4R | 3.48 | 0 | 0.96 | 0.45 | 46.9 | ATP @ 0 cm |
310-M0015B-5R | 4.44 | 0 | 1.50 | 0.37 | 24.7 | |
310-M0015B-6R | 5.94 | 0 | 1.38 | 0.69 | 50.0 | |
310-M0015B-7R | 7.32 | 0 | 0.39 | 0.40 | 102.6 | |
310-M0015B-8R | 7.71 | 0 | 0.90 | 0.75 | 83.3 | |
310-M0015B-9R | 8.61 | 0 | 0.75 | 0.67 | 89.3 | |
310-M0015B-10R | 9.36 | 0 | 0.70 | 0.55 | 78.6 | |
310-M0015B-11R | 10.06 | 0 | 0.71 | 0.71 | 100.0 | |
310-M0015B-12R | 10.77 | 0 | 0.56 | 0.68 | 121.4 | shattered liner, all material replaced |
310-M0015B-13R | 11.33 | 0 | 1.41 | 0.94 | 66.7 | |
310-M0015B-14R | 12.74 | 0 | 0.75 | 0.57 | 76.0 | |
310-M0015B-15R | 13.49 | 0 | 0.30 | 0.30 | 100.0 | |
310-M0015B-16R | 13.79 | 0 | 0.35 | 0.37 | 105.7 | liner damaged |
310-M0015B-17R | 14.14 | 0 | 1.50 | 1.43 | 95.3 | |
310-M0015B-18R | 15.64 | 0 | 1.11 | 0.67 | 60.4 | liner damaged |
310-M0015B-19R | 16.75 | 0 | 1.17 | 1.06 | 90.6 | |
310-M0015B-20R | 17.92 | 0 | 0.95 | 0.73 | 76.8 | liner damaged |
310-M0015B-21R | 18.87 | 0 | 1.20 | 1.36 | 113.3 | liner damaged |
310-M0015B-22R | 20.07 | 0 | 0.60 | 0.36 | 60.0 | liner damaged |
310-M0015B-23R | 20.67 | 0 | 0.73 | 0.68 | 93.2 | |
310-M0015B-24R | 21.40 | 0 | 1.00 | 0.59 | 59.0 | liner damaged |
310-M0015B-25R | 22.40 | 0 | 1.50 | 1.09 | 72.7 | |
310-M0015B-26R | 23.90 | 0 | 1.41 | 1.01 | 71.6 | |
310-M0015B-27R | 25.31 | 0 | 0.79 | 0.36 | 45.6 | |
310-M0015B-28R | 26.10 | 0 | 1.30 | 0.45 | 34.6 | |
310-M0015B-29R | 27.40 | 0 | 0.75 | 0.70 | 93.3 | liner damaged, material replaced |
310-M0015B-30R | 28.15 | 0 | 0.24 | 0.20 | 83.3 | blocked off |
310-M0015B-31R | 28.39 | 0 | 0.26 | 0.22 | 84.6 | |
310-M0015B-32R | 28.65 | 0 | 0.26 | 0.35 | 134.6 | liner damaged, material replaced |
310-M0015B-33R | 28.91 | 0 | 2.00 | 1.40 | 70.0 | split barrel, core put into half liner on drill deck |
310-M0015B-34R | 30.91 | 0 | 0.88 | 0.97 | 110.2 | split barrel, core put into half liner on drill deck -- ATP @ 63 cm |
310-M0015B-35R | 31.79 | 0 | 1.87 | 0.92 | 49.2 | split barrel, core put into half liner on drill deck -- ATP @ 43 cm |
310-M0015B-36R | 33.66 | 0 | 0.76 | 0.90 | 118.4 | split barrel, core put into half liner on drill deck |
310-M0015B-37R | 34.42 | 0 | 2.69 | 1.12 | 41.6 | split barrel, core put into half liner on drill deck |
310-M0015B-38R | 37.11 | 0 | 3.01 | 3.09 | 102.7 | split barrel, core placed into liner on drill deck - ATP + MBIO @ 265 cm |