Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Blum, Peter; Kroon, Dick; Zachos, James C; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 208-1267 [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.272410

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Related to:
ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/
Zachos, James C; Kroon, Dick; Blum, Peter; et al. (2004): Proceedings of the Ocean Drilling Program, 208 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 208, online, https://doi.org/10.2973/odp.proc.ir.208.2004
Further details:
Project(s):
Coverage:
Latitude: -28.098083 * Longitude: 1.710967
Date/Time Start: 2003-04-21T00:00:00 * Date/Time End: 2003-04-26T00:00:00
Minimum Elevation: -4354.7 m * Maximum Elevation: -4354.7 m
Event(s):
208-1267 * Latitude: -28.098083 * Longitude: 1.710967 * Date/Time Start: 2003-04-21T00:00:00 * Date/Time End: 2003-04-26T00:00:00 * Elevation: -4354.7 m * Penetration: 641.1 m * Recovery: 636.6 m * Location: South Atlantic Ocean * Campaign: Leg208 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 69 cores; 641.1 m cored; 0 m drilled; 99.3 % recovery
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Sample code/labelSample labelShipboard Scientific PartyDSDP/ODP/IODP sample designation
Section Top in meters below surfaceTopmbsfShipboard Scientific Party
Section Top in meters composite depthTopmcdShipboard Scientific Party
Cumulative OffsetCum OffsetmShipboard Scientific Party
Differential OffsetDiff OffsetmShipboard Scientific Party
Interval CoredCoredmShipboard Scientific Party
Curatorial Length CoredCurmShipboard Scientific Party
RecoveryRecoverymShipboard Scientific Partybased on the sum of liner lengths for a given core
RecoveryRecovery%Shipboard Scientific Partybased on the drillers cored interval over liner length recovery
10 Sampling dateSampling dateShipboard Scientific Party
11 CommentCommentShipboard Scientific Party
Size:
712 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Sample label

Top [mbsf]

Top [mcd]

Cum Offset [m]

Diff Offset [m]

Cored [m]

Cur [m]

Recovery [m]

Recovery [%]
10 
Sampling date
11 
Comment
208-1267A-1H0.00.030.030.038.98.908.90100.002003-04-21T19:25
208-1267B-1H0.00.000.000.003.13.183.18102.602003-04-24T01:20
208-1267B-2H3.14.030.930.939.59.759.75102.602003-04-24T02:25
208-1267A-2H8.99.570.670.649.59.519.51100.102003-04-21T20:30
208-1267B-3H12.615.342.741.819.57.127.1274.902003-04-24T03:20Mech. Shear
208-1267A-3H18.421.793.392.729.59.969.96104.802003-04-21T21:35Tensor on @ 20:25 Hrs
208-1267B-4H22.127.315.212.479.59.899.89104.102003-04-24T04:50
208-1267A-4H27.933.525.622.239.58.448.4488.802003-04-21T23:00Mech. Shear
208-1267B-5H31.636.745.14-0.079.59.209.2096.802003-04-24T05:55
208-1267A-5H37.442.294.89-0.739.59.799.79103.102003-04-22T00:25
208-1267B-6H41.147.045.940.809.59.669.66101.702003-04-24T06:55
208-1267A-6H46.951.264.36-0.539.59.839.83103.502003-04-22T01:45
208-1267B-7H50.656.916.310.379.59.229.2297.102003-04-24T07:55
208-1267A-7H56.463.767.363.009.59.729.72102.302003-04-22T03:00
208-1267B-8H60.166.786.680.379.59.859.85103.702003-04-24T09:00
208-1267A-8H65.973.807.900.549.59.779.77102.802003-04-22T04:05
208-1267B-9H69.680.9511.354.679.59.809.80103.202003-04-24T10:05
208-1267A-9H75.484.549.141.249.57.597.5979.902003-04-22T05:05
208-1267B-10H79.188.629.52-1.839.58.338.3387.702003-04-24T11:35Tensor in @ 10:25hrs.
208-1267A-10H84.993.989.08-0.069.510.1010.10106.302003-04-22T06:30
208-1267B-11H88.699.2310.631.119.59.379.3798.602003-04-24T12:40
208-1267A-11H94.4103.218.81-0.279.59.529.52100.202003-04-22T07:40
208-1267B-12H98.1108.7110.61-0.029.59.059.0595.302003-04-24T14:05
208-1267A-12H103.9113.9610.061.259.59.509.50100.002003-04-22T08:45
208-1267B-13H107.6119.5711.971.369.59.019.0194.802003-04-24T15:05
208-1267A-13H113.4124.9711.571.519.59.509.50100.002003-04-22T10:25Drill Over
208-1267B-14H117.1130.5713.471.509.59.019.0194.802003-04-24T16:15
208-1267A-14H122.9136.0513.151.589.59.859.85103.702003-04-22T11:45Drill over, Tensor out @ 11:45 Hrs; Note: Torqued Rods
208-1267B-15H126.6141.0114.410.949.59.079.0795.502003-04-24T17:30Tensor out @ 17:30 Hrs
208-1267A-15H132.4146.1013.700.559.59.649.64101.502003-04-22T14:10Tensor in @ 11:45 Hrs
208-1267B-16H136.1151.4815.380.979.59.289.2897.702003-04-24T18:35Tensor on @ 17:30 hrs
208-1267A-16H141.9158.3016.402.709.59.079.0795.502003-04-22T15:20
208-1267B-17H145.6162.6817.081.709.59.929.92104.402003-04-24T19:35
208-1267A-17H151.4168.2116.810.419.59.509.50100.002003-04-22T16:55Drill Over
208-1267B-18H155.1172.8817.780.709.59.769.76102.702003-04-24T20:40
208-1267A-18H160.9179.0718.171.369.59.849.84103.602003-04-22T18:10
208-1267B-19H164.6183.3218.720.949.59.989.98105.102003-04-24T21:45Run IWS tool
208-1267A-19H170.4189.8719.471.309.59.289.2897.702003-04-22T19:20Tensor out @ 19:20 Hrs Crushed Liner.
208-1267B-20H174.1195.1421.042.329.510.0510.05105.802003-04-24T23:55
208-1267A-20H179.9200.9521.051.589.58.618.6190.602003-04-22T20:30Tensor on @19:20 hrs
208-1267B-21H183.6206.4222.821.789.59.959.95104.702003-04-25T01:05
208-1267A-21H189.4211.4522.051.009.59.619.61101.202003-04-22T22:10Drill Over
208-1267B-22H193.1217.4124.311.499.59.969.96104.802003-04-25T02:10
208-1267A-22H198.9222.8823.981.939.510.1110.11106.402003-04-22T23:15
208-1267B-23H202.6228.4325.831.529.59.789.78102.902003-04-25T03:15
208-1267A-23H208.4233.3224.920.949.59.989.98105.102003-04-23T00:45Drill over.
208-1267B-24H212.1239.8727.771.949.510.0510.05105.802003-04-25T06:30Drill over.
208-1267A-24H217.9245.4927.592.678.78.778.77100.802003-04-23T03:45Drill over stuck core barrel Core liner was forced out of core barrel. Top 7.08 m came out in one continous piece, inside of liner. Bottom 1.67 m was recurated in split liner and the CC.
208-1267B-25H221.6251.5529.952.189.59.929.92104.402003-04-25T11:30Drill over stuck core barrel
208-1267A-25H226.6257.3330.733.149.59.899.89104.102003-04-23T07:00Drill Over
208-1267B-26X231.1261.7730.670.723.35.555.55168.202003-04-25T12:30
208-1267B-27X234.4269.7535.354.689.68.578.5789.302003-04-25T13:45
208-1267A-26X236.1267.8331.731.008.89.709.70110.202003-04-23T08:30
208-1267B-28X244.0279.3435.34-0.019.68.808.8091.702003-04-25T15:05
208-1267A-27X244.9278.1333.231.509.68.408.4087.502003-04-23T09:45
208-1267B-29X253.6288.2134.61-0.739.78.538.5387.902003-04-25T16:20
208-1267A-28X254.5287.3032.80-0.439.67.527.5278.302003-04-23T11:00
208-1267B-30X263.3297.0433.74-0.879.69.879.87102.802003-04-25T18:05
208-1267A-29X264.1296.4432.34-0.469.69.179.1795.502003-04-23T12:20
208-1267B-31X272.9308.1535.251.518.17.757.7595.702003-04-25T19:20
208-1267A-30X273.7306.7133.010.679.69.859.85102.602003-04-23T13:45
208-1267B-32X281.0315.6034.60-0.659.69.739.73101.402003-04-25T20:50Run IWS Down To 2267 mtrs.
208-1267A-31X283.3317.7034.401.399.69.619.61100.102003-04-23T15:00
208-1267B-33X290.6327.2436.642.049.69.889.88102.902003-04-25T23:05
208-1267A-32X292.9328.9136.011.619.67.907.9082.302003-04-23T16:25
208-1267B-34X300.2337.0236.820.189.69.809.80102.102003-04-26T00:30
208-1267A-33X302.5339.4536.950.949.69.859.85102.602003-04-23T17:45Run IWS Tool
208-1267B-35X309.8348.5538.751.939.69.849.84102.502003-04-26T02:05
208-1267B-36X319.4358.1538.750.009.69.879.87102.802003-04-26T03:30Run IWS