Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Blum, Peter; Kroon, Dick; Zachos, James C; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 208-1266 [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.272409

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Related to:
ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/
Zachos, James C; Kroon, Dick; Blum, Peter; et al. (2004): Proceedings of the Ocean Drilling Program, 208 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 208, online, https://doi.org/10.2973/odp.proc.ir.208.2004
Further details:
Project(s):
Coverage:
Latitude: -28.542500 * Longitude: 2.343500
Date/Time Start: 2003-04-15T00:00:00 * Date/Time End: 2003-04-21T00:00:00
Minimum Elevation: -3797.6 m * Maximum Elevation: -3797.6 m
Event(s):
208-1266 * Latitude: -28.542500 * Longitude: 2.343500 * Date/Time Start: 2003-04-15T00:00:00 * Date/Time End: 2003-04-21T00:00:00 * Elevation: -3797.6 m * Penetration: 953.8 m * Recovery: 591.5 m * Location: Walvis Ridge, Southeast Atlantic Ocean * Campaign: Leg208 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 67 cores; 603.6 m cored; 350.2 m drilled; 98 % recovery
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Sample code/labelSample labelShipboard Scientific PartyDSDP/ODP/IODP sample designation
Section Top in meters below surfaceTopmbsfShipboard Scientific Party
Section Top in meters composite depthTopmcdShipboard Scientific Party
Cumulative OffsetCum OffsetmShipboard Scientific Party
Differential OffsetDiff OffsetmShipboard Scientific Party
Interval CoredCoredmShipboard Scientific Party
Curatorial Length CoredCurmShipboard Scientific Party
RecoveryRecoverymShipboard Scientific Partybased on the sum of liner lengths for a given core
RecoveryRecovery%Shipboard Scientific Partybased on the drillers cored interval over liner length recovery
10 Sampling dateSampling dateShipboard Scientific Party
11 CommentCommentShipboard Scientific Party
Size:
699 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Sample label

Top [mbsf]

Top [mcd]

Cum Offset [m]

Diff Offset [m]

Cored [m]

Cur [m]

Recovery [m]

Recovery [%]
10 
Sampling date
11 
Comment
208-1266A-1H0.03.143.143.149.510.0410.04105.702003-04-15T22:15
208-1266B-1H0.00.000.000.007.67.657.65100.702003-04-17T20:20
208-1266A-2H9.514.074.571.439.59.939.93104.502003-04-15T23:05
208-1266A-3H19.024.995.991.429.59.409.4098.902003-04-16T00:15
208-1266A-4H28.535.917.411.429.58.958.9594.202003-04-16T01:25
208-1266A-5H38.046.848.841.439.59.959.95104.702003-04-16T02:25
208-1266A-6H47.557.7710.271.439.59.889.88104.002003-04-16T03:25
208-1266A-7H57.068.6911.691.429.59.949.94104.602003-04-16T04:45
208-1266C-1H62.070.178.178.179.59.619.61101.202003-04-19T02:55Tensor in @ 01:50 hrs.
208-1266A-8H66.579.6113.111.429.59.739.73102.402003-04-16T05:45
208-1266C-2H71.580.659.150.989.510.0010.00105.302003-04-19T03:50
208-1266A-9H76.090.5414.541.438.68.668.66100.702003-04-16T07:20Drill Over
208-1266C-3H81.090.959.950.807.47.457.45100.702003-04-19T05:05Drill Over
208-1266A-10H84.6100.4315.831.299.59.389.3898.702003-04-16T09:00Drill over. Tensor On @ 07:15 Hrs.
208-1266C-4H88.499.5211.121.179.59.839.83103.502003-04-19T06:15
208-1266A-11H94.1111.3517.251.429.59.719.71102.202003-04-16T10:00
208-1266C-5H97.9111.7513.852.739.59.509.50100.002003-04-19T09:00Drill over.
208-1266A-12H103.6122.2818.681.439.510.1610.16106.902003-04-16T10:55
208-1266C-6H107.4123.5216.122.278.68.608.60100.002003-04-19T13:15Note Sheared GS OS
208-1266A-13H113.1133.2020.101.429.510.1210.12106.502003-04-16T12:40Drill Over
208-1266C-7H116.0133.2617.261.149.59.049.0495.202003-04-19T14:35
208-1266A-14H122.6144.1321.531.439.59.889.88104.002003-04-16T13:50
208-1266C-8H125.5142.6917.19-0.079.59.539.53100.302003-04-19T15:30
208-1266A-15H132.1155.0522.951.429.59.889.88104.002003-04-16T14:45Tensor out @ 14:45
208-1266C-9H135.0153.4818.481.299.59.079.0795.502003-04-19T16:35Tensor out @ 16:35 Hrs
208-1266A-16H141.6165.9824.381.439.510.1310.13106.602003-04-16T16:25Tensor in @ 14:50 hrs, Drill Over
208-1266C-10H144.5164.3619.861.389.510.0410.04105.702003-04-19T17:45Tensor In @ 16:35 Hrs.
208-1266A-17H151.1176.9125.811.439.59.239.2397.202003-04-16T17:35
208-1266C-11H154.0175.3621.361.509.59.899.89104.102003-04-19T18:45
208-1266A-18H160.6187.8327.231.429.59.799.79103.102003-04-16T18:55Drill Over
208-1266C-12H163.5187.2323.732.379.59.539.53100.302003-04-19T19:50
208-1266A-19H170.1198.7628.661.439.59.029.0294.902003-04-16T19:55
208-1266C-13H173.0198.4725.471.749.59.549.54100.402003-04-19T21:25Drill Over
208-1266A-20H179.6209.6830.081.429.59.639.63101.402003-04-16T21:15Drill Over
208-1266C-14H182.5209.2526.751.289.59.829.82103.402003-04-19T22:55Drill Over, Tensor Out @ 22:55 Hrs. - Run DST
208-1266A-21H189.1220.6031.501.429.510.0510.05105.802003-04-16T23:05Drill Over
208-1266A-22H198.6231.5332.931.439.510.1210.12106.502003-04-17T01:08Drill Over
208-1266A-23H208.1242.4534.351.426.96.976.97101.002003-04-17T03:00Drill Over
208-1266A-24H215.0250.3935.391.040.90.930.93103.302003-04-17T04:10
208-1266A-25H215.9251.4335.530.141.21.281.28106.702003-04-17T05:20
208-1266A-26X217.1252.8135.710.184.51.611.6135.802003-04-17T07:00
208-1266B-2X220.0253.0033.0033.009.59.619.61101.202003-04-18T05:05Break Circulation
208-1266A-27X221.6257.9836.380.679.59.399.3998.802003-04-17T08:00Break circulation.
208-1266B-3X229.5263.9234.421.429.59.779.77102.802003-04-18T06:00
208-1266A-28X231.1268.9137.811.439.66.336.3365.902003-04-17T09:00Break circulation.
208-1266B-4X239.0274.8535.851.439.59.689.68101.902003-04-18T07:40
208-1266A-29X240.7279.9439.241.439.69.419.4198.002003-04-17T10:05Break Circulation
208-1266C-15X245.0280.1335.138.389.59.659.65101.602003-04-20T05:20
208-1266B-5H248.5285.7837.281.439.59.999.99105.202003-04-18T09:15Drill over.
208-1266A-30X250.3290.9940.691.459.79.689.6899.802003-04-17T11:30Break circulation
208-1266C-16H254.5291.2136.711.589.510.0810.08106.102003-04-20T07:15Drill over
208-1266B-6H258.0296.7038.701.429.510.2510.25107.902003-04-18T11:00Drill over.
208-1266A-31X260.0303.1343.132.449.75.295.2954.502003-04-17T12:35Brk. Circ.
208-1266C-17H264.0303.6639.662.959.59.939.93104.502003-04-20T09:15Drill over.
208-1266B-7X267.5307.6240.121.425.58.398.39152.502003-04-18T12:20
208-1266A-32X269.7313.3043.600.479.67.827.8281.502003-04-17T13:45
208-1266B-8X273.0316.8643.863.749.68.518.5188.602003-04-18T13:30
208-1266C-18H273.5314.9341.431.779.29.289.28100.902003-04-20T11:10Drill over.
208-1266A-33X279.3324.3345.031.439.68.198.1985.302003-04-17T15:00
208-1266B-9X282.6326.7744.170.319.69.779.77101.802003-04-18T14:50
208-1266C-19X282.7325.7343.031.609.59.079.0795.502003-04-20T12:40
208-1266A-34X288.9337.6848.783.759.76.316.3165.102003-04-17T16:30
208-1266B-10X292.2337.8145.611.449.69.939.93103.402003-04-18T16:10
208-1266B-11X301.8348.8547.051.449.69.439.4398.202003-04-18T17:25
208-1266B-12X311.4359.8948.491.449.67.457.4577.602003-04-18T19:00
208-1266C-20X315.0361.2846.283.259.65.985.9862.302003-04-20T16:35
208-1266C-21X324.6370.8846.280.009.68.538.5388.902003-04-20T18:45