/* DATA DESCRIPTION: Citation: Blum, Peter; Kroon, Dick; Zachos, James C; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 208-1262. PANGAEA, https://doi.org/10.1594/PANGAEA.272405 Related to: ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/ Zachos, James C; Kroon, Dick; Blum, Peter; et al. (2004): Proceedings of the Ocean Drilling Program, 208 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 208, online, https://doi.org/10.2973/odp.proc.ir.208.2004 Further details: Corelog information - Janus3-01 (URI: http://iodp.tamu.edu/database/janusmodel/01_Corelog.pdf) Project(s): Ocean Drilling Program (ODP) (URI: http://www-odp.tamu.edu/) Coverage: LATITUDE: -27.185833 * LONGITUDE: 1.577000 DATE/TIME START: 2003-03-24T00:00:00 * DATE/TIME END: 2003-03-29T00:00:00 MINIMUM ELEVATION: -4755.4 m * MAXIMUM ELEVATION: -4755.4 m Event(s): 208-1262 * LATITUDE: -27.185833 * LONGITUDE: 1.577000 * DATE/TIME START: 2003-03-24T00:00:00 * DATE/TIME END: 2003-03-29T00:00:00 * ELEVATION: -4755.4 m * Penetration: 583.9 m * Recovery: 502.5 m * LOCATION: Walvis Ridge, Southeast Atlantic Ocean * CAMPAIGN: Leg208 (URI: https://doi.org/10.2973/odp.proc.ir.208.2004) * BASIS: Joides Resolution (URI: http://www-odp.tamu.edu/resolutn.html) * METHOD/DEVICE: Composite Core (COMPCORE) * COMMENT: 54 cores; 493.9 m cored; 90 m drilled; 101.7 % recovery Parameter(s): Sample code/label (Sample label) * PI: Shipboard Scientific Party * METHOD/DEVICE: DSDP/ODP/IODP sample designation (URI: hdl:10013/epic.27914.d001) Section Top in meters below surface [mbsf] (Top) * PI: Shipboard Scientific Party Section Top in meters composite depth [mcd] (Top) * PI: Shipboard Scientific Party Cumulative Offset [m] (Cum Offset) * PI: Shipboard Scientific Party Differential Offset [m] (Diff Offset) * PI: Shipboard Scientific Party Interval Cored [m] (Cored) * PI: Shipboard Scientific Party Curatorial Length Cored [m] (Cur) * PI: Shipboard Scientific Party Recovery [m] (Recovery) * PI: Shipboard Scientific Party * COMMENT: based on the sum of liner lengths for a given core Recovery [%] (Recovery) * PI: Shipboard Scientific Party * COMMENT: based on the drillers cored interval over liner length recovery Sampling date (Sampling date) * PI: Shipboard Scientific Party Comment (Comment) * PI: Shipboard Scientific Party License: Creative Commons Attribution 3.0 Unported (CC-BY-3.0) (URI: https://creativecommons.org/licenses/by/3.0/) Size: 557 data points */ Sample label Top [mbsf] Top [mcd] Cum Offset [m] Diff Offset [m] Cored [m] Cur [m] Recovery [m] Recovery [%] Sampling date Comment 208-1262A-1H 0.0 6.04 6.04 6.04 9.5 10.02 10.02 105.50 2003-03-25T04:20 208-1262B-1H 0.0 0.00 0.00 0.00 6.9 6.91 6.91 100.10 2003-03-26T15:20 Bottom Water Tempature 208-1262B-2H 6.9 3.57 -3.33 -3.33 5.0 8.98 8.98 179.60 2003-03-26T16:55 208-1262A-2H 9.5 15.81 6.31 0.27 9.5 9.97 9.97 104.90 2003-03-25T05:55 208-1262B-3H 11.9 14.31 2.41 5.74 9.5 8.13 8.13 85.60 2003-03-26T18:05 208-1262A-3H 19.0 26.31 7.31 1.00 9.5 9.46 9.46 99.60 2003-03-25T07:10 Tensor On @ 05:40 Hrs. 208-1262B-4H 21.4 23.39 1.99 -0.42 9.5 8.50 8.50 89.50 2003-03-26T19:30 Camera in @ 18:55 hrs 208-1262A-4H 28.5 36.01 7.51 0.20 9.5 10.07 10.07 106.00 2003-03-25T08:45 208-1262B-5H 30.9 33.41 2.51 0.52 9.5 9.36 9.36 98.50 2003-03-26T20:45 208-1262A-5H 38.0 46.96 8.96 1.45 9.5 9.92 9.92 104.40 2003-03-25T10:00 208-1262B-6H 40.4 42.28 1.88 -0.63 8.0 9.05 9.05 113.10 2003-03-26T22:05 208-1262A-6H 47.5 58.25 10.75 1.79 9.5 10.16 10.16 106.90 2003-03-25T11:25 208-1262B-7H 48.4 52.73 4.33 2.45 9.5 9.12 9.12 96.00 2003-03-26T23:20 208-1262A-7H 57.0 68.39 11.39 0.64 9.5 9.78 9.78 102.90 2003-03-25T12:50 Mech Shear, Camera out @ 12:50 208-1262B-8H 57.9 62.79 4.89 0.56 9.5 9.69 9.69 102.00 2003-03-27T00:45 208-1262A-8H 66.5 80.54 14.04 2.65 9.5 7.51 7.51 79.10 2003-03-25T14:10 Camera in @14:50; Note broken liner Split Liner. 208-1262B-9H 67.4 74.27 6.87 1.98 9.5 9.72 9.72 102.30 2003-03-27T02:10 Tensor in @ 02:00 hrs. 208-1262A-9H 76.0 91.21 15.21 1.17 9.5 9.68 9.68 101.90 2003-03-25T15:20 Mech Shear 208-1262B-10H 76.9 84.32 7.42 0.55 9.5 9.86 9.86 103.80 2003-03-27T03:15 208-1262A-10H 85.5 101.61 16.11 0.90 9.5 9.84 9.84 103.60 2003-03-25T16:55 208-1262B-11H 86.4 95.98 9.58 2.16 9.5 9.04 9.04 95.20 2003-03-27T04:30 208-1262C-1H 90.0 97.78 7.78 7.78 9.5 5.16 5.16 54.30 2003-03-28T01:10 Tensor On @ 23:30 Crushed Liner: Core liner stuck in barrel. Came out in three pieces. Could be lost recovery between each piece. Biggest void is proably between sections 3 and 4. 208-1262A-11H 95.0 111.05 16.05 -0.06 9.5 9.29 9.29 97.80 2003-03-25T18:10 208-1262B-12H 95.9 106.54 10.64 1.06 9.5 9.20 9.20 96.80 2003-03-27T05:35 208-1262C-2H 99.5 109.29 9.79 2.01 9.5 9.03 9.03 95.10 2003-03-28T02:45 208-1262A-12H 104.5 121.11 16.61 0.56 9.5 9.61 9.61 101.20 2003-03-25T20:10 note: Rehead AFT CW, Camera out @ 20:10 Hrs 208-1262B-13H 105.4 116.37 10.97 0.33 9.5 8.72 8.72 91.80 2003-03-27T06:55 208-1262C-3H 109.0 118.97 9.97 0.18 9.5 9.02 9.02 94.90 2003-03-28T04:15 208-1262A-13H 114.0 132.11 18.11 1.50 9.5 10.02 10.02 105.50 2003-03-25T21:50 208-1262B-14H 114.9 126.79 11.89 0.92 9.5 9.57 9.57 100.70 2003-03-27T08:20 208-1262C-4H 118.5 124.01 5.51 -4.46 4.0 8.45 8.45 211.20 2003-03-28T05:25 208-1262C-5H 122.5 134.73 12.23 6.72 9.5 9.38 9.38 98.70 2003-03-28T06:40 208-1262A-14H 123.5 142.72 19.22 1.11 9.5 9.26 9.26 97.50 2003-03-26T00:15 208-1262B-15H 124.4 136.72 12.32 0.43 9.5 9.57 9.57 100.70 2003-03-27T09:40 208-1262C-6H 132.0 144.49 12.49 0.26 9.5 9.18 9.18 96.60 2003-03-28T07:50 Tensor in @ 06:40 hrs. 208-1262A-15H 133.0 153.16 20.16 0.94 9.5 8.84 8.84 93.10 2003-03-26T06:30 One on the forward winch. Drill over stuck barrel 208-1262B-16H 133.9 146.76 12.86 0.54 9.5 9.94 9.94 104.60 2003-03-27T10:55 208-1262C-7H 141.5 152.09 10.59 -1.90 7.5 9.84 9.84 131.20 2003-03-28T09:08 208-1262A-16H 142.5 163.46 20.96 0.80 9.5 10.08 10.08 106.10 2003-03-26T07:50 Tensor on @ 06:00hrs. 208-1262B-17H 143.4 157.02 13.62 0.76 9.5 9.26 9.26 97.50 2003-03-27T11:55 208-1262C-8H 149.0 162.00 13.00 2.41 9.5 8.92 8.92 93.90 2003-03-28T10:13 208-1262A-17H 152.0 172.39 20.39 -0.57 9.5 10.02 10.02 105.50 2003-03-26T09:15 Core barrel parted on 18H./ 60K overpull. 208-1262B-18H 152.9 167.99 15.09 1.47 9.5 10.04 10.04 105.70 2003-03-27T13:10 208-1262C-9H 158.5 172.32 13.82 0.82 9.5 9.90 9.90 104.20 2003-03-28T11:20 208-1262B-19H 162.4 178.49 16.09 1.00 9.5 9.77 9.77 102.80 2003-03-27T14:20 208-1262C-10H 168.0 182.92 14.92 1.10 9.5 9.56 9.56 100.60 2003-03-28T12:30 208-1262B-20H 171.9 189.23 17.33 1.24 9.5 9.61 9.61 101.20 2003-03-27T15:25 208-1262C-11H 177.5 194.02 16.52 1.60 6.5 8.24 8.24 126.80 2003-03-28T13:45 208-1262B-21H 181.4 201.34 19.94 2.61 9.5 9.25 9.25 97.40 2003-03-27T16:45 Camera out @ 16:45 hrs. 208-1262C-12H 184.0 202.78 18.78 2.26 9.5 9.30 9.30 97.90 2003-03-28T14:55 Tensor in @13:45 hrs. 208-1262B-22H 190.9 211.89 20.99 1.05 9.5 9.94 9.94 104.60 2003-03-27T18:10 208-1262C-13H 193.5 214.54 21.04 2.26 9.5 9.94 9.94 104.60 2003-03-28T16:10 K/T boundary in sect 2. 208-1262B-23H 200.4 223.58 23.18 2.19 9.5 9.30 9.30 97.90 2003-03-27T19:40 Camera out @ 19:40 hrs. 208-1262C-14H 203.0 226.42 23.42 2.38 9.5 10.01 10.01 105.40 2003-03-28T17:30