Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Miller, D Jay; d'Hondt, Steven L; Jørgensen, Bo Barker; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 201-1229 [dataset]. PANGAEA, https://doi.org/10.1594/PANGAEA.272372

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Related to:
d'Hondt, Steven L; Jørgensen, Bo Barker; Miller, David J; et al. (2003): Proceedings of the Ocean Drilling Program, 201 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 201, online, https://doi.org/10.2973/odp.proc.ir.201.2003
ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/
Project(s):
Coverage:
Latitude: -10.976150 * Longitude: -77.957783
Date/Time Start: 2002-03-06T00:00:00 * Date/Time End: 2002-03-10T00:00:00
Minimum Elevation: -151.9 m * Maximum Elevation: -151.9 m
Event(s):
201-1229 * Latitude: -10.976150 * Longitude: -77.957783 * Date/Time Start: 2002-03-06T00:00:00 * Date/Time End: 2002-03-10T00:00:00 * Elevation: -151.9 m * Penetration: 465.9 m * Recovery: 367.4 m * Location: South Pacific Ocean * Campaign: Leg201 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 55 cores; 464.4 m cored; 1.5 m drilled; 79.1 % recovery
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Sample code/labelSample labelShipboard Scientific PartyDSDP/ODP/IODP sample designation
Section Top in meters below surfaceTopmbsfShipboard Scientific Party
Section Top in meters composite depthTopmcdShipboard Scientific Party
Cumulative OffsetCum OffsetmShipboard Scientific Party
Differential OffsetDiff OffsetmShipboard Scientific Party
Interval CoredCoredmShipboard Scientific Party
Curatorial Length CoredCurmShipboard Scientific Party
RecoveryRecoverymShipboard Scientific Partybased on the sum of liner lengths for a given core
RecoveryRecovery%Shipboard Scientific Partybased on the drillers cored interval over liner length recovery
10 Sampling dateSampling dateShipboard Scientific Party
11 CommentCommentShipboard Scientific Party
Size:
591 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Sample label

Top [mbsf]

Top [mcd]

Cum Offset [m]

Diff Offset [m]

Cored [m]

Cur [m]

Recovery [m]

Recovery [%]
10 
Sampling date
11 
Comment
201-1229A-1H0.00.000.000.004.94.894.8999.802002-03-06T17:30H2S: 50ppm
201-1229B-1H0.00.000.000.005.45.395.3999.802002-03-08T16:10H2S: 15ppm no acetone
201-1229C-1H0.00.000.000.008.88.808.80100.002002-03-08T19:40Whirl-Pac Crushed Liner: Upper liner crushed. Not good for MBIO sampling. Science Party requested to move to another hole. H2S: 40ppm
201-1229D-1H0.00.000.000.006.86.796.7999.902002-03-08T20:05Whirl-Pac H2S: H2S 15ppm
201-1229E-1H0.00.000.000.007.57.467.4699.502002-03-09T20:30H2S: 1 ppm
201-1229A-2H4.94.900.000.009.59.349.3498.302002-03-06T18:30H2S: 50ppm
201-1229B-2H5.45.400.000.009.59.639.63101.402002-03-08T16:30H2S: 2 ppm no acetone
201-1229D-2H6.86.800.000.009.59.679.67101.802002-03-09T00:05H2S: 20ppm H2S
201-1229E-2H7.57.500.000.009.59.629.62101.302002-03-09T21:15H2S: 3ppm
201-1229A-3H14.414.400.000.009.59.659.65101.602002-03-06T20:4515ppm
201-1229B-3H14.914.900.000.009.59.829.82103.402002-03-08T16:50Ran HYACE @189.5meters H2S: 20 ppm no acetone
201-1229D-3H16.316.300.000.009.59.389.3898.702002-03-09T01:45H2S: 20 ppm, H2S
201-1229E-3H17.017.000.000.009.59.359.3598.402002-03-09T21:45H2S: 5 ppm
201-1229A-4H23.923.900.000.009.58.968.9694.302002-03-06T22:55DVTP @ 197m - 33.4m Bsf H2S: 30ppm
201-1229B-4M24.40.000.001.02002-03-08T17:30Ran HYACE @189.5meters
201-1229D-4H25.825.800.000.009.57.737.7381.402002-03-09T03:35H2S: over 100 ppm
201-1229E-4H26.526.500.000.009.58.628.6290.702002-03-09T22:15H2S: 1ppm
201-1229A-5H33.433.400.000.006.58.998.99138.302002-03-07T00:45H2S: 30ppm
201-1229D-5H35.335.300.000.004.55.755.75127.802002-03-09T05:10H2S: 10ppm
201-1229E-5H36.036.000.000.009.59.619.61101.202002-03-09T22:35H2S: 1ppm
201-1229D-6H39.839.800.000.009.59.429.4299.202002-03-09T06:30H2S: 20ppm
201-1229A-6H39.939.900.000.009.53.803.8040.002002-03-07T02:10H2S: 10ppm
201-1229E-6H45.545.500.000.009.54.754.7550.002002-03-09T23:10Crushed Liner.
201-1229D-7H49.349.300.000.009.56.576.5769.202002-03-09T07:40H2S: 20ppm
201-1229A-7H49.449.400.000.009.50.160.161.702002-03-07T03:40
201-1229E-7H55.055.000.000.009.59.529.52100.202002-03-10T00:30H2S: 5ppm
201-1229D-8H58.858.800.000.009.57.657.6580.502002-03-09T09:00H2S: 1ppm Split Liner: Shattered liner. core transferred to new liner
201-1229A-8H58.958.900.000.009.59.559.55100.502002-03-07T04:35DVTP @ 232m - 68.4m Bsf <1ppm
201-1229E-8H64.564.500.000.009.59.689.68101.902002-03-10T01:00
201-1229D-9H68.368.300.000.009.58.588.5890.302002-03-09T10:25Drill rat hole w / centre bit H2S: <1ppm
201-1229A-9H68.468.400.000.009.58.748.7492.002002-03-07T06:10DVTP-P @ 241.50m - 77.9m H2S: <1ppm
201-1229E-9H74.074.000.000.009.53.473.4736.502002-03-10T01:30DVTP @ 245.5m
201-1229D-10P77.877.800.000.002.00.860.8643.002002-03-09T12:30PCS
201-1229A-10H79.479.400.000.009.58.968.9694.302002-03-07T09:40H2S: <1ppm
201-1229D-11H79.879.800.000.004.54.754.75105.602002-03-09T13:00
201-1229E-10H83.583.500.000.009.52.702.7028.402002-03-10T03:10Crushed Liner.
201-1229D-12H84.384.300.000.003.03.363.36112.002002-03-09T14:20
201-1229D-13H87.387.300.000.009.58.048.0484.602002-03-09T16:15
201-1229A-11H88.988.900.000.009.59.839.83103.502002-03-07T10:45H2S: 3ppm
201-1229E-11H93.093.000.000.009.59.509.4899.802002-03-10T03:50AHC Drill over barrel
201-1229D-14H96.896.800.000.009.55.925.9262.302002-03-09T17:35
201-1229A-12H98.498.400.000.009.58.688.6891.402002-03-07T13:25Drill Over bbl Run DVTP @ 271 M H2S: <1ppm
201-1229E-12H102.5102.500.000.009.59.569.56100.602002-03-10T04:25AHC DRILL OVER BBL
201-1229D-15H106.3106.300.000.009.56.506.5068.402002-03-09T19:00Drill Over bbl
201-1229A-13H107.9107.900.000.009.55.625.6259.202002-03-07T15:10H2S: 13ppm
201-1229E-13H112.0112.000.000.009.55.825.8261.302002-03-10T04:50
201-1229A-14H117.4117.400.000.009.58.788.7892.402002-03-07T17:00Drill Over bbl <1ppm
201-1229A-15H126.9126.900.000.009.52.132.1322.402002-03-07T18:20Crushed Liner.
201-1229A-16H136.4136.400.000.009.53.213.2133.802002-03-07T19:45Crushed Liner.
201-1229A-17H145.9145.900.000.009.50.090.090.902002-03-07T20:55
201-1229A-18H155.4155.400.000.009.58.108.1085.302002-03-07T22:30Drill Over bbl DVTP @328.50 155MBSF
201-1229A-19H164.9164.900.000.009.56.326.3266.502002-03-08T00:35Whirl-Pac
201-1229A-20M174.4174.400.000.001.00.260.2626.002002-03-08T02:50Hyace 338m 1st run no shear.
201-1229A-21H175.4175.400.000.009.52.142.1422.502002-03-08T03:20
201-1229A-22H184.9184.900.000.009.54.904.9051.602002-03-08T04:55