/* DATA DESCRIPTION: Citation: Miller, D Jay; d'Hondt, Steven L; Jørgensen, Bo Barker; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 201-1225. PANGAEA, https://doi.org/10.1594/PANGAEA.272368 Related to: d'Hondt, Steven L; Jørgensen, Bo Barker; Miller, David J; et al. (2003): Proceedings of the Ocean Drilling Program, 201 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 201, online, https://doi.org/10.2973/odp.proc.ir.201.2003 ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/ Further details: Corelog information - Janus3-01 (URI: http://iodp.tamu.edu/database/janusmodel/01_Corelog.pdf) Project(s): Ocean Drilling Program (ODP) (URI: http://www-odp.tamu.edu/) Coverage: LATITUDE: 2.770867 * LONGITUDE: -110.571483 DATE/TIME START: 2002-02-07T00:00:00 * DATE/TIME END: 2002-02-07T00:00:00 MINIMUM ELEVATION: -3760.5 m * MAXIMUM ELEVATION: -3760.5 m Event(s): 201-1225 * LATITUDE: 2.770867 * LONGITUDE: -110.571483 * DATE/TIME: 2002-02-07T00:00:00 * ELEVATION: -3760.5 m * Penetration: 633.9 m * Recovery: 636.1 m * LOCATION: North Pacific Ocean * CAMPAIGN: Leg201 (URI: https://doi.org/10.2973/odp.proc.ir.201.2003) * BASIS: Joides Resolution (URI: http://www-odp.tamu.edu/resolutn.html) * METHOD/DEVICE: Composite Core (COMPCORE) * COMMENT: 69 cores; 628.9 m cored; 5 m drilled; 101.1 % recovery Parameter(s): Sample code/label (Sample label) * PI: Shipboard Scientific Party * METHOD/DEVICE: DSDP/ODP/IODP sample designation (URI: hdl:10013/epic.27914.d001) Section Top in meters below surface [mbsf] (Top) * PI: Shipboard Scientific Party Section Top in meters composite depth [mcd] (Top) * PI: Shipboard Scientific Party Cumulative Offset [m] (Cum Offset) * PI: Shipboard Scientific Party Differential Offset [m] (Diff Offset) * PI: Shipboard Scientific Party Interval Cored [m] (Cored) * PI: Shipboard Scientific Party Curatorial Length Cored [m] (Cur) * PI: Shipboard Scientific Party Recovery [m] (Recovery) * PI: Shipboard Scientific Party * COMMENT: based on the sum of liner lengths for a given core Recovery [%] (Recovery) * PI: Shipboard Scientific Party * COMMENT: based on the drillers cored interval over liner length recovery Sampling date (Sampling date) * PI: Shipboard Scientific Party Comment (Comment) * PI: Shipboard Scientific Party License: Creative Commons Attribution 3.0 Unported (CC-BY-3.0) (URI: https://creativecommons.org/licenses/by/3.0/) Size: 724 data points */ Sample label Top [mbsf] Top [mcd] Cum Offset [m] Diff Offset [m] Cored [m] Cur [m] Recovery [m] Recovery [%] Sampling date Comment 201-1225A-1H 0.0 0.00 0.00 0.00 4.3 4.29 4.29 99.80 2002-02-08T09:00 Sea Floor Temp Only 201-1225B-1H 0.0 0.00 0.00 0.00 9.0 8.96 8.96 99.60 2002-02-11T13:10 201-1225C-1H 0.0 0.00 0.00 0.00 8.8 8.79 8.79 99.90 2002-02-11T14:15 201-1225A-2H 4.3 4.30 0.00 0.00 9.5 10.03 10.03 105.60 2002-02-08T10:15 Whirl Pack 201-1225C-2H 8.8 8.80 0.00 0.00 9.5 9.96 9.96 104.80 2002-02-11T15:10 201-1225A-3H 13.8 13.80 0.00 0.00 9.5 9.85 9.85 103.70 2002-02-08T11:20 Camera set @ 11:20hrs. 201-1225C-3H 18.3 18.30 0.00 0.00 9.5 10.04 10.04 105.70 2002-02-11T16:30 Started Tensor #1@ 15:10 Hrs. 201-1225A-4H 23.3 23.30 0.00 0.00 9.5 9.81 9.81 103.30 2002-02-08T12:30 201-1225C-4H 27.8 27.80 0.00 0.00 9.5 10.01 10.01 105.40 2002-02-11T17:20 201-1225A-5H 32.8 32.80 0.00 0.00 9.5 10.16 10.16 106.90 2002-02-08T14:15 201-1225C-5H 37.3 37.30 0.00 0.00 9.5 9.31 9.31 98.00 2002-02-11T18:40 201-1225A-6H 42.3 42.30 0.00 0.00 9.5 10.11 10.11 106.40 2002-02-08T15:25 201-1225C-6H 46.8 46.80 0.00 0.00 9.5 10.02 10.02 105.50 2002-02-11T19:35 201-1225A-7H 51.8 51.80 0.00 0.00 9.5 9.95 9.95 104.70 2002-02-08T17:05 201-1225C-7H 56.3 56.30 0.00 0.00 9.5 9.84 9.84 103.60 2002-02-11T20:35 201-1225A-8H 61.3 61.30 0.00 0.00 9.5 10.01 10.01 105.40 2002-02-08T18:15 201-1225C-8H 65.8 65.80 0.00 0.00 9.5 10.02 10.02 105.50 2002-02-11T21:35 201-1225A-9H 70.8 70.80 0.00 0.00 9.5 10.02 10.02 105.50 2002-02-08T19:45 201-1225C-9H 75.3 75.30 0.00 0.00 9.5 9.87 9.87 103.90 2002-02-11T22:30 Started #2 Tensor @ 22:25 Hrs. 201-1225A-10H 80.3 80.30 0.00 0.00 9.5 10.06 10.06 105.90 2002-02-08T20:50 201-1225C-10H 84.8 84.80 0.00 0.00 9.5 9.73 9.73 102.40 2002-02-11T23:25 201-1225A-11H 89.8 89.80 0.00 0.00 9.5 10.01 10.01 105.40 2002-02-08T21:55 201-1225C-11H 94.3 94.30 0.00 0.00 9.5 9.91 9.91 104.30 2002-02-12T00:25 201-1225A-12H 99.3 99.30 0.00 0.00 9.5 9.96 9.96 104.80 2002-02-08T23:00 201-1225C-12H 103.8 103.80 0.00 0.00 9.5 9.64 9.64 101.50 2002-02-12T01:25 201-1225A-13H 108.8 108.80 0.00 0.00 9.5 10.03 10.03 105.60 2002-02-09T00:10 201-1225C-13H 113.3 113.30 0.00 0.00 9.5 9.84 9.84 103.60 2002-02-12T02:20 201-1225A-14H 118.3 118.30 0.00 0.00 9.5 10.23 10.23 107.70 2002-02-09T01:50 ADARA, METH. 201-1225C-14H 122.8 122.80 0.00 0.00 9.5 9.83 9.83 103.50 2002-02-12T03:20 201-1225A-15H 127.8 127.80 0.00 0.00 9.5 9.98 9.98 105.10 2002-02-09T03:10 Camera set # 02:00hrs. 201-1225C-15H 132.3 132.30 0.00 0.00 9.5 9.80 9.80 103.20 2002-02-12T04:15 201-1225A-16H 137.3 137.30 0.00 0.00 9.5 10.23 10.23 107.70 2002-02-09T04:15 201-1225C-16H 141.8 141.80 0.00 0.00 9.5 10.05 10.05 105.80 2002-02-12T05:25 AHC Drill over barrel. 201-1225A-17H 146.8 146.80 0.00 0.00 9.5 9.56 9.56 100.60 2002-02-09T05:40 Whirl pack 201-1225C-17H 151.3 151.30 0.00 0.00 9.5 9.52 9.52 100.20 2002-02-12T07:00 top of core is soupy 201-1225A-18H 156.3 156.30 0.00 0.00 9.5 9.78 9.78 102.90 2002-02-09T06:55 201-1225C-18H 160.8 160.80 0.00 0.00 9.5 9.66 9.66 101.70 2002-02-12T08:00 Started #3 Tensor @ 06:50 Hrs. 201-1225A-19H 165.8 165.80 0.00 0.00 9.5 9.98 9.98 105.10 2002-02-09T08:00 201-1225C-19H 170.3 170.30 0.00 0.00 9.5 9.86 9.86 103.80 2002-02-12T09:00 201-1225A-20H 175.3 175.30 0.00 0.00 9.5 9.96 9.96 104.80 2002-02-09T09:25 AHC 201-1225C-20H 179.8 179.80 0.00 0.00 9.5 9.13 9.13 96.10 2002-02-12T09:50 201-1225A-21H 184.8 184.80 0.00 0.00 9.5 9.62 9.62 101.30 2002-02-09T10:25 201-1225C-21H 189.3 189.30 0.00 0.00 9.5 9.70 9.70 102.10 2002-02-12T10:55 201-1225A-22H 194.3 194.30 0.00 0.00 9.5 9.96 9.96 104.80 2002-02-09T11:45 Changed camera # 10:45 hrs. Whirl pack. DVTP AFTER#22core 201-1225C-22H 198.8 198.80 0.00 0.00 9.5 9.65 9.65 101.60 2002-02-12T12:00 201-1225A-23H 205.3 205.30 0.00 0.00 9.5 10.11 10.11 106.40 2002-02-09T17:15 Drill Over bbl 201-1225C-23H 208.3 208.30 0.00 0.00 9.5 9.89 9.89 104.10 2002-02-12T13:25 Drill Over bbl 201-1225A-24H 214.8 214.80 0.00 0.00 9.5 10.05 10.05 105.80 2002-02-09T18:35 Drill Over bbl 201-1225C-24H 217.8 217.80 0.00 0.00 9.5 10.02 10.02 105.50 2002-02-12T14:45 Drill Over bbl 201-1225A-25H 224.3 224.30 0.00 0.00 9.5 10.03 10.03 105.60 2002-02-09T19:50 Drill Over bbl 201-1225C-25H 227.3 227.30 0.00 0.00 9.5 9.95 9.95 104.70 2002-02-12T16:45 Drill Over bbl Tensor #4 @ 14:40 201-1225A-26H 233.8 233.80 0.00 0.00 9.5 10.02 10.02 105.50 2002-02-09T21:35 Drill Over bbl 201-1225C-26H 236.8 236.80 0.00 0.00 9.5 10.08 10.08 106.10 2002-02-12T18:30 Drill Over bbl 201-1225A-27H 243.3 243.30 0.00 0.00 9.5 10.13 10.13 106.60 2002-02-09T23:25 AHC 201-1225C-27H 246.3 246.30 0.00 0.00 9.5 10.06 10.06 105.90 2002-02-12T19:40 Drill Over bbl 201-1225A-28X 252.8 0.00 0.00 9.4 0.00 0.00 0.00 2002-02-10T03:30 AHC 201-1225C-28H 255.8 255.80 0.00 0.00 9.5 10.08 10.08 106.10 2002-02-12T21:10 Drill Over bbl 201-1225A-29P 262.2 262.20 0.00 0.00 1.0 1.41 1.41 141.00 2002-02-10T05:30 AHC PCS core: 0-88cm in pressure core barrel, 88-141cm in break-off sub and bit. 201-1225A-30H 264.2 264.20 0.00 0.00 9.5 8.79 8.79 92.50 2002-02-10T07:25 AHC Started Tensor #6 @ 05:55 Drilled Over Core Barrel Estimated ADV 8m 201-1225C-29H 265.3 265.30 0.00 0.00 9.5 6.86 6.86 72.20 2002-02-12T22:30 Drill Over bbl Start Camera @ 2220 hrs bottom of core, about 20cm at bottom of section 5 was taooly disturbed 201-1225A-31H 273.7 273.70 0.00 0.00 9.5 10.12 10.12 106.50 2002-02-10T09:05 AHC Drill over barrel 201-1225C-30H 274.8 274.80 0.00 0.00 9.5 10.04 10.04 105.70 2002-02-13T00:05 AHC Drilled over barrel 201-1225A-32H 283.2 283.20 0.00 0.00 9.5 10.00 10.00 105.30 2002-02-10T10:50 AHC Drill over barrel 201-1225C-31H 284.3 284.30 0.00 0.00 9.5 10.09 10.09 106.20 2002-02-13T01:45 AHC Drilled over barrel. 201-1225A-33H 292.7 292.70 0.00 0.00 9.5 10.03 10.03 105.60 2002-02-10T12:30 DVDP-P after core # 33 201-1225C-32P 293.8 293.80 0.00 0.00 1.0 1.02 1.02 102.00 2002-02-13T03:30 AHC 201-1225C-33H 295.8 295.80 0.00 0.00 9.5 3.24 3.24 34.10 2002-02-13T18:45 Retrieved Core Barrel w/ Drill String. 201-1225A-34H 303.7 303.70 0.00 0.00 9.5 10.12 10.12 106.50 2002-02-10T17:45 201-1225A-35X 313.2 313.20 0.00 0.00 6.4 7.25 7.25 113.30 2002-02-10T19:25