Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Keigwin, Lloyd D; Rio, Domenico; Acton, Gary D; Shipboard Scientific Party (2005): Hole/Core summary of ODP Site 172-1062. PANGAEA, https://doi.org/10.1594/PANGAEA.272209

Always quote citation above when using data! You can download the citation in several formats below.

RIS CitationBibTeX CitationShow MapGoogle Earth

Related to:
Keigwin, Lloyd D; Rio, Domenico; Acton, Gary D; et al. (1998): Proceedings of the Ocean Drilling Program 172 Initial Reports. Proceedings of the Ocean Drilling Program, Ocean Drilling Program, 172, online, https://doi.org/10.2973/odp.proc.ir.172.1998
ODP/TAMU (2005): JANUS Database. Ocean Drilling Program, Texas A&M University, College Station TX 77845-9547, USA; (data copied from Janus 2005-02 to 2005-06), http://www-odp.tamu.edu/database/
Project(s):
Coverage:
Latitude: 28.246222 * Longitude: -74.410472
Date/Time Start: 1997-03-14T00:00:00 * Date/Time End: 1997-03-14T00:00:00
Minimum Elevation: -4761.0 m * Maximum Elevation: -4761.0 m
Event(s):
172-1062 * Latitude: 28.246222 * Longitude: -74.410472 * Date/Time: 1997-03-14T00:00:00 * Elevation: -4761.0 m * Penetration: 1008.7 m * Recovery: 999.6 m * Location: Blake-Bahama Outer Ridge, North Atlantic Ocean * Campaign: Leg172 * Basis: Joides Resolution * Method/Device: Composite Core (COMPCORE) * Comment: 109 cores; 999.1 m cored; 9.6 m drilled; 100% recovery
Parameter(s):
#NameShort NameUnitPrincipal InvestigatorMethod/DeviceComment
Sample code/labelSample labelShipboard Scientific PartyDSDP/ODP/IODP sample designation
Section Top in meters below surfaceTopmbsfShipboard Scientific Party
Section Top in meters composite depthTopmcdShipboard Scientific Party
Cumulative OffsetCum OffsetmShipboard Scientific Party
Differential OffsetDiff OffsetmShipboard Scientific Party
Interval CoredCoredmShipboard Scientific Party
Curatorial Length CoredCurmShipboard Scientific Party
RecoveryRecoverymShipboard Scientific Partybased on the sum of liner lengths for a given core
RecoveryRecovery%Shipboard Scientific Partybased on the drillers cored interval over liner length recovery
10 Sampling dateSampling dateShipboard Scientific Party
11 CommentCommentShipboard Scientific Party
Size:
1139 data points

Data

Download dataset as tab-delimited text — use the following character encoding:


Sample label

Top [mbsf]

Top [mcd]

Cum Offset [m]

Diff Offset [m]

Cored [m]

Cur [m]

Recovery [m]

Recovery [%]
10 
Sampling date
11 
Comment
172-1062A-1H0.00.000.000.002.22.152.1597.701997-03-14T23:10
172-1062B-1H0.00.000.000.005.05.005.00100.001997-03-16T01:00
172-1062C-1H0.00.360.360.369.49.399.3999.901997-03-17T08:05
172-1062D-1H0.00.020.020.025.85.815.81100.201997-03-17T23:55
172-1062E-1H0.00.840.840.843.83.793.7999.701997-03-18T15:30
172-1062F-1H0.00.000.000.007.17.107.10100.001997-03-19T18:30
172-1062G-1H0.02.522.522.529.39.279.2799.701997-03-20T08:15Missed MudLine
172-1062H-1H0.00.000.000.006.56.536.53100.501997-03-20T09:25
172-1062A-2H2.24.602.402.409.59.489.4899.801997-03-15T00:25
172-1062E-2H3.85.061.260.429.59.499.4999.901997-03-18T16:50
172-1062B-2H5.06.301.301.309.59.749.74102.501997-03-16T02:00
172-1062D-2H5.85.38-0.42-0.449.59.289.2897.701997-03-18T02:45Ran WSTP f/bottom water sample between H1 & H2
172-1062H-2H6.57.561.061.069.59.689.68101.901997-03-20T10:15
172-1062F-2H7.18.341.241.249.59.229.2297.101997-03-19T19:35
172-1062C-2H9.49.840.440.089.59.919.91104.301997-03-17T09:05
172-1062A-3H11.714.622.920.529.59.789.78102.901997-03-15T01:20
172-1062E-3H13.314.681.380.129.59.839.83103.501997-03-18T17:50
172-1062B-3H14.516.562.060.769.58.508.5089.501997-03-16T02:50Split Liner Split Liner Split Liner.
172-1062D-3H15.315.600.300.729.59.819.81103.301997-03-18T03:40
172-1062H-3H16.017.061.060.009.59.869.86103.801997-03-20T11:25Tensor Tool Tensor Started @ 1015 Hrs Tensor Tool.
172-1062F-3H16.617.480.88-0.369.59.569.56100.601997-03-19T20:35
172-1062C-3H18.920.141.240.809.59.749.74102.501997-03-17T10:00
172-1062A-4H21.225.644.441.529.59.759.75102.601997-03-15T02:50Tensor/ADARA Start Tensor @ 0120 Hrs Oriented/ADARA.
172-1062E-4H22.825.362.561.189.59.589.58100.801997-03-18T18:55Start tensor at 17:50 hrs.
172-1062B-4H24.025.841.84-0.229.59.789.78102.901997-03-16T03:45Imploded bottom
172-1062D-4H24.825.240.440.149.59.429.4299.201997-03-18T04:45
172-1062H-4H25.526.561.060.009.59.919.91104.301997-03-20T12:25Tensor Tensor Tool.
172-1062F-4H26.128.041.941.069.59.449.4499.401997-03-19T21:30
172-1062C-4H28.430.482.080.849.59.839.83103.501997-03-17T10:55
172-1062A-5H30.735.504.800.369.59.929.92104.401997-03-15T03:50Tensor Tensor Tool.
172-1062E-5H32.335.943.641.089.59.709.70102.101997-03-18T20:00Tensor Tool.
172-1062B-5H33.536.563.061.229.59.949.94104.601997-03-16T04:40
172-1062D-5H34.335.781.481.049.59.789.78102.901997-03-18T05:40
172-1062H-5H35.036.061.060.009.510.0710.07106.001997-03-20T13:35Tensor
172-1062F-5H35.639.023.421.489.59.659.65101.601997-03-19T22:30
172-1062C-5H37.941.483.581.509.59.659.65101.601997-03-17T11:50
172-1062A-6H40.247.227.022.229.59.889.88104.001997-03-15T04:55Tensor bolt test, OK Tensor Tool.
172-1062E-6H41.845.924.120.489.59.589.58100.801997-03-18T21:05Tensor Tool.
172-1062B-6H43.047.344.341.289.59.879.87103.901997-03-16T05:35
172-1062D-6H43.846.742.941.469.59.209.2096.801997-03-18T06:35
172-1062H-6H44.545.561.060.009.59.599.59100.901997-03-20T14:45
172-1062F-6H45.149.003.900.489.59.709.70102.101997-03-19T23:30
172-1062C-6H47.451.163.760.189.59.759.75102.601997-03-17T12:50
172-1062A-7H49.757.748.041.029.510.0510.05105.801997-03-15T06:15Tensor/ADARA Oriented/ADARA.
172-1062E-7H51.356.284.980.869.59.879.87103.901997-03-18T22:10Tensor Tool.
172-1062B-7H52.557.304.800.469.59.929.92104.401997-03-16T06:30
172-1062D-7H53.357.464.161.229.59.649.64101.501997-03-18T07:30
172-1062H-7H54.055.061.060.009.59.659.65101.601997-03-20T15:55
172-1062F-7H54.659.204.600.709.59.639.63101.401997-03-20T00:25
172-1062C-7H56.960.663.760.009.59.739.73102.401997-03-17T13:45Imploded top end
172-1062A-8H59.266.867.66-0.389.59.519.51100.101997-03-15T07:20Tensor Tool Liner busted top end Tensor Tool.
172-1062E-8H60.867.266.461.489.59.619.61101.201997-03-18T23:15Sec 3,4,5,6,7 split 90 deg off because of split Split liner, lower half Tensor Tool.
172-1062B-8H62.067.995.991.199.59.689.68101.901997-03-16T07:30
172-1062D-8H62.867.494.690.539.59.769.76102.701997-03-18T08:30Imploded @ bottom
172-1062F-8H64.169.024.920.329.59.619.71102.201997-03-20T01:20Split Liner
172-1062C-8H66.471.415.011.259.59.149.1496.201997-03-17T14:55Tensor Start tensor @ 13:50 hrs/ Big implode top end Liner split along double line sect 3,4,5
172-1062A-9H68.775.707.00-0.669.59.729.72102.301997-03-15T08:25Tensor Tool Tensor Tool.
172-1062E-9H70.376.966.660.209.510.0410.04105.701997-03-19T00:20split liner Tensor Tool.
172-1062B-9H71.577.325.82-0.179.57.457.4578.401997-03-16T08:20Split liner, end to end 2 meters of sucked-in material recovered in bottom section of liner. Material not curated. EMc
172-1062D-9H72.376.624.32-0.379.59.969.96104.801997-03-18T09:30
172-1062F-9H73.679.085.480.569.59.769.76102.701997-03-20T02:25
172-1062C-9H75.979.883.98-1.039.59.719.71102.201997-03-17T16:00
172-1062A-10H78.285.066.86-0.149.59.959.95104.701997-03-15T09:45ADARA Tensor out for this core
172-1062E-10H79.888.668.862.209.59.679.67101.801997-03-19T01:25Tensor Broken top liner Tensor Tool.
172-1062B-10H81.087.066.060.249.59.769.76102.701997-03-16T09:15
172-1062C-10H85.489.934.530.559.59.649.64101.501997-03-17T17:10Tensor
172-1062A-11H87.795.147.440.589.59.949.94104.601997-03-15T10:55Tensor Tool
172-1062E-11H89.397.748.44-0.429.510.289.95104.701997-03-19T02:20No tensor, liner split & broken Sections cut short (140 cm) to compensate for gas expansion.
172-1062B-11H90.597.146.640.589.59.769.76102.701997-03-16T10:10
172-1062C-11H94.999.664.760.239.59.819.81103.301997-03-17T18:15
172-1062A-12H97.2105.107.900.469.59.599.59100.901997-03-15T12:40Liner imploded top end
172-1062E-12H98.8107.248.440.009.510.209.95104.701997-03-19T03:30Tensor Tool Started Tensor @ 0220 Hrs/ broken top liner Sections cut short (140cm) to compensate for expanding/gassy sediment. Tensor Tool.
172-1062B-12H100.0106.846.840.209.59.389.3898.701997-03-16T11:05Liner broken in middle
172-1062C-12H104.4110.566.161.409.59.329.3298.101997-03-17T19:20
172-1062A-13H106.7114.467.76-0.149.59.089.0895.601997-03-15T14:00
172-1062E-13H108.3116.748.440.009.59.639.50100.001997-03-19T04:35Tensor Tool Sections cut short (130cm) to compensate for expanding sediments. Tensor Tool.
172-1062B-13H109.5116.246.74-0.109.59.549.54100.401997-03-16T12:05
172-1062C-13H113.9120.146.240.089.59.309.3097.901997-03-17T20:25Tensor
172-1062A-14H116.2124.568.360.609.58.118.1185.401997-03-15T15:15Tensor Imploded top
172-1062E-14H117.8126.248.440.009.59.359.1296.001997-03-19T05:40Sections cut short (130cm) to compensate for expanding gas/sediment. Tensor Tool.
172-1062B-14H119.0126.147.140.409.59.749.74102.501997-03-16T13:05Imploded top, broken in middle, bottom o.k. Liner parted between sec 4 & 5 while pulling from barrel. Some material lost.
172-1062C-14H123.4129.385.98-0.269.59.649.64101.501997-03-17T21:35
172-1062A-15H125.7134.168.460.109.59.629.62101.301997-03-15T16:25
172-1062E-15H127.3135.748.440.009.510.439.93104.501997-03-19T06:45Sections cut short (130cm) to compensate for expanding sediment/gas. Tensor Tool.
172-1062B-15H128.5135.967.460.329.59.639.63101.401997-03-16T14:05Split Liner, end to end Liner split entire length, spiraled sect 6
172-1062A-16H135.2144.229.020.569.59.509.50100.001997-03-15T17:45
172-1062E-16H136.8145.248.440.008.38.668.2899.801997-03-19T07:55Tensor Tool Tensor Tool.
172-1062B-16H138.0146.988.981.529.59.939.93104.501997-03-16T15:20Upper part of core split.
172-1062A-17H144.7154.649.940.929.59.319.3198.001997-03-15T18:50
172-1062E-17X145.1153.548.440.006.05.585.5893.001997-03-19T08:55
172-1062B-17H147.5156.468.96-0.029.29.209.20100.001997-03-16T16:25
172-1062E-18X151.1159.548.440.009.68.638.6389.901997-03-19T09:553 meters fill
172-1062A-18H154.2166.1411.942.009.59.259.2597.401997-03-15T19:55
172-1062B-18X156.7165.668.960.005.44.574.5784.601997-03-16T17:40
172-1062E-19X160.7169.148.440.009.75.585.5857.501997-03-19T11:004 meters fill
172-1062B-19X162.1171.068.960.009.69.969.96103.801997-03-16T18:55
172-1062A-19H163.7175.6411.940.009.59.119.1195.901997-03-15T21:05
172-1062E-20X170.4178.848.440.009.57.427.4278.101997-03-19T12:055 meters of fill
172-1062B-20X171.7180.668.960.009.69.699.69100.901997-03-16T20:05
172-1062A-20H173.2185.1411.940.007.57.547.54100.501997-03-15T22:10Stiff clay incomplete srroke t.d.
172-1062E-21X179.9188.348.440.009.68.698.6990.501997-03-19T13:155 meters of fill
172-1062B-21X181.3190.268.960.009.69.859.85102.601997-03-16T21:25
172-1062E-22X189.5197.948.440.009.710.0610.06103.701997-03-19T14:304 1/2 mtrs of fill
172-1062B-22X190.9199.868.960.009.69.689.68100.801997-03-16T22:40
172-1062E-23X199.2207.648.440.009.69.879.87102.801997-03-19T15:451 1/2 mtrs fill
172-1062B-23X200.5209.468.960.009.79.979.97102.801997-03-16T23:50
172-1062B-24X210.2219.168.960.009.69.399.4998.901997-03-17T01:00
172-1062B-25X219.8228.768.960.009.69.329.3297.101997-03-17T02:05
172-1062B-26X229.4238.368.960.009.69.739.73101.401997-03-17T03:153.5 Meters Fill